Similar Projects
County Road 4 Waterline Relocation
Infrastructure
Results
Gulf Shores, AL

Provision of Roadway Pipe for the Baldwin County Commission
Results
AL

Canal Road Widening Water Main Relocation (SR-161 to Wilson Boulevard)
Infrastructure
Post-Bid
Orange Beach, AL 36561

Installation of Advanced Metering Infrastructure
Results
$354,825 est. value
Robertsdale, AL 36567

Country Club Drive Water Main Replacement
Infrastructure
Post-Bid
Fairhope, AL 36532

Sr-182 State Park Road 2 Water Main Extension
Infrastructure
Post-Bid
Gulf Shores, AL

Installation of Bored Pipelines for Waterline Expansion - Baldwin Beach Express
Results
Summerdale, AL 36580

On Call Contractor Services for Water and Sewer
Infrastructure
Results
$30,000 est. value
Fairhope, AL

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Canal Road Widening Water Main Relocation (Phase 2)
Infrastructure
Post-Bid
Orange Beach, AL 36561

Plastic Pipe
Post-Bid
Daphne, AL

Construction of Raw Water Main for Diamante Well
Infrastructure
Results
$277,790 est. value
Daphne, AL

Water System Improvements Phase 1 Friendship Road to County Road 13 USDA Rural Development
Results
Daphne, AL 36526

U.S. 98 Water Main Improvements Phase A - Ryan Road to Gable Street
Results
$390,000 to $440,000 est. value
Daphne, AL 36526

County Road 4 Raw Water Main Upgrades
Post-Bid
Orange Beach, AL

Reported 01/07/2022 12:00 AM
Project Title

Effluent Outfall Upgrades USDA Rural Development

Physical Address View project details and contacts
City, State (County) Loxley, AL 36551   (Baldwin County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of the installation of approximately 20,500 linear feet of new 16” PVC force main, 300 linear feet of new 16” ductile iron force main, and 2,380 linear feet of fusible PVC (directional bore) force main and all related appurtenances.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents