Similar Projects
Boat Storage Facility
New Construction - 40,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Gloucester, MA

Little Beach Pier and Beach Maintenance Project
Conception
Falmouth, MA 02114

Sycamore Grove Deck Project
Infrastructure
Bidding
$52,000 est. value
Backbay Beacon Hill, MA

Replacement of Winter Island Finger Floats
Post-Bid
Less than $40,000 est. value
Salem, MA 01970

Oak Bluffs Structural Pier Repairs 2020
Post-Bid
Less than $500,000 est. value
Falmouth, MA

Barlows Landing Dinghy Dock Improvement
Results
$260,000 est. value
Buzzards Bay, MA

Houghs Neck Boat Ramp Reconstruction Project
Results
Less than $750,000 est. value
Quincy, MA 02169

Crosby Yacht Yard
New Construction
Construction
Osterville, MA

Steel Sheet Pile Bulkhead, Associated Tie-Back Anchor Systems, and Concrete Cap
Post-Bid
$1,050,000 est. value
Fairhaven, MA 02719

Project Manager Services for Town Landing Beach/Park
Results
Less than $10,000 est. value
Pembroke, MA

MWRA Boat Storage Facility and Cosgrove Deck Drainage Improvements - Filed Sub Bids
Post-Bid
Less than $1,800,000 est. value
Clinton, MA 01510

Marine Construction Services
Results
Gloucester, MA 01930

Isles of Shoals Harbor of Refuge, NH & ME
Post-Bid
$5,000,000 to $10,000,000 est. value
Concord, MA - Cape Elizabeth, ME - Rye, NH

New Decking, Cole Court 667-1 & 667-2
Results
Less than $98,266 est. value
Holliston, MA 01746

Dry- Dock and Overhaul Services for the M/V Governor
Post-Bid
Falmouth, MA

Reported 06/12/2021 12:00 AM
Project Title

Replacement of Pier Fender System, Plymouth Breakwater Footbridge

Physical Address View project details and contacts
City, State (County) Plymouth, MA 02360   (Plymouth County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value $100,000 to $250,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work of this project involves the replacement of the timber diagonal pile bracing at the east and west sets of piles and the replacement of the timber fendering system around the timber piles. Work will be conducted under the existing timber footbridge and over the tidal waters of Plymouth Harbor. During construction, the footbridge will remain open for public access to the crest of the Plymouth Breakwater.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents