Similar Projects
Heating, Ventilation and Air Conditioning Services
Term Contract
Sub-Bidding
Irvine, CA 92606

Removal and Replacement of Hvac Equipment at Various Sites
Renovation
Sub-Bidding
$200,000 CJ est. value
Costa Mesa, CA 92628

Police Headquarters Lobby Roof and HVAC Rehabilitation
Term Contract
Post-Bid
Orange, CA 92867

Heating, Ventilation, Air Conditioning and Refrigeration Parts and Equipment
Term Contract
Post-Bid
Tustin, CA

HVAC Unit Replacement at Anaheim Bus Base Operations Building
Term Contract
Results
Anaheim, CA

Community Center HVAC and Roof
Alteration
Results
$545,000 est. value
Cypress, CA 90630

RFQ Contractor - Med Sci D356 Modular Clean Room
Renovation
Sub-Bidding
$770,000 CJ est. value
Irvine, CA 92606

Heating, Ventilation, and Air Conditioning Services
Term Contract
Post-Bid
Orange, CA

Orange Coast College Air Handler Unit Replacement, Building 7
Renovation
Results
$198,000 CJ est. value
Costa Mesa, CA 92626

Miscellaneous Insulation Repairs on Steam Piping at Central Utility Facility
Alteration
Post-Bid
Tustin, CA

Buena Park High School Classroom HVAC Replacement
Renovation
Results
$293,043 CJ est. value
Buena Park, CA 90621

Heating, Ventilation and Air Conditioning (HVAC) Preventative Maintenance and Repair Services within Orange County
Term Contract
Post-Bid
Irvine, CA 92618

Air Compressor Maintenance and Repair Services
Term Contract
Post-Bid
Irvine, CA 92606

Purchase and Delivery of 25-Ton Air Conditioning Units
Term Contract
Post-Bid
Tustin, CA 92780

Repair and Maintenance of Twin Cyclone Bus Vacuum and Cyclonic Trash Separation Systems
Term Contract
Post-Bid
$110,000 CJ est. value
Santa Ana, CA 92701

Last Updated 07/08/2023 02:35 AM
Project Title

Peterson Elementary School

Physical Address View project details and contacts
City, State (County) Huntington Beach, CA 92646   (Orange County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

: HVAC in Kindergarten Peterson Elementary School (the "Project"). The Project consists of installation of HVAC in 3 classrooms. Questions on the Contract Documents should be addressed to Mark Manstof, Director, FMOT at mmanstof@hbcsd.us. Each bid must conform and be responsive to all pertinent bidding and Contract Documents. All Work shall commence on Friday, June 23, 2023, and be completed by Friday, August 25, 2023. Notice to Proceed shall be issued immediately after award of the Contract

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents