Similar Projects
Last Updated | 05/11/2022 07:01 AM |
Project Title | 24" Cross Drain and Junction Box Reconstruction |
Physical Address | View project details and contacts |
City, State (County) | Lincolnton, GA (Lincoln County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sanitary Sewers, Storm/Sewers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 24” cross drain and junction box reconstruction at the intersection of North Peachtree and Goshen Street - 1. Saw and remove existing asphalt 2. Install 24” RCP 3. Connect to existing storm manhole, install stone bedding and select backfill as needed for storm pipe. 4. Remove/replace existing concrete sidewalk, curb and gutter required to install new 24” storm pipe. 5. Patch over 24” storm pipe with 6” of concrete. Bring concrete within 2” of existing road grade. 6. Clean, tack and install 2” of 12.5 MM of asphalt of 6” concrete patch. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |