Similar Projects
Enotah Village Sewer Line Rehabilitation Project
Infrastructure
Bidding
Young Harris, GA

Thompson Road Sewer Replacement
Infrastructure
Bidding
$300,000 est. value
Perry, GA 31069

Sewer Cleaning and Mapping
Post-Bid
Jekyll Island, GA

Combined Sewer Replacement
Post-Bid
Atlanta, GA

Omnitrax Utility Extension
Results
Less than $589,472 est. value
Rincon, GA 31326

Harrington Lane Storm Drain Replacement Project
Results
Lawrenceville, GA 30046

781 James Circle Storm Drain Repair Project
Post-Bid
Lawrenceville, GA

Annual Contract Installation of Water/Sewer Lines
Term Contract
Results
Less than $8,355,125 est. value
Calhoun, GA 30701

Grease Trap Services (Plant Services)
Post-Bid
Athens, GA

Sanitary Sewer Flow Metering Phase 1
Results
Less than $495,540 est. value
Union City, GA 30291

Installation of Water and Wastewater Infrastructure
Term Contract
Post-Bid
GA 31543

Bonnybridge Road Secondary Outfall Improvements
Results
Port Wentworth, GA 31407

2021/2022 Camera Pipe Inspection Van
Infrastructure
Post-Bid
Augusta, GA

FY 2020 Storm System Repairs Project 2
Results
Stone Mountain, GA

Sewer Step Tank Replacement
Infrastructure
Post-Bid
Lookout Mountain, GA

Last Updated 05/11/2022 07:01 AM
Project Title

24" Cross Drain and Junction Box Reconstruction

Physical Address View project details and contacts
City, State (County) Lincolnton, GA   (Lincoln County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

24” cross drain and junction box reconstruction at the intersection of North Peachtree and Goshen Street - 1. Saw and remove existing asphalt 2. Install 24” RCP 3. Connect to existing storm manhole, install stone bedding and select backfill as needed for storm pipe. 4. Remove/replace existing concrete sidewalk, curb and gutter required to install new 24” storm pipe. 5. Patch over 24” storm pipe with 6” of concrete. Bring concrete within 2” of existing road grade. 6. Clean, tack and install 2” of 12.5 MM of asphalt of 6” concrete patch.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents