Similar Projects
Parklot Improvements to Lots 76 and 80
Infrastructure
Bidding
$600,000 est. value
Salt Lake City, UT 84113

6000 West Pre-Cast Fence and Sidewalk
Post-Bid
Herriman, UT 84096

SLC Airport Parking Lot E Pedestrian Canopy
Post-Bid
Salt Lake City, UT 84122

Holladay Safe Routes to School Safe Routes to Schools/Pedestrian/Bicycle Safety
Results
Less than $500,000 est. value
UT

SR-85; MP 3.52-20.84, Various Improvements HSIP - Highway Safety Improvement/Intersection Improvement
Results
$1,500,000 to $3,000,000 est. value
UT

Slc Airport Aoc Vehicle Canopy
Post-Bid
Salt Lake City, UT 84122

Terra Linda Parking Lot Enhancement
Results
West Jordan, UT 84088

Station 115 Parking Lot Concrete Repair
Post-Bid
UT 84006

South Salt Lake City Fire Station 42 Parking Lot Reconstruction
Results
$150,000 to $200,000 est. value
Salt Lake City, South Salt Lake, UT

City Wide Park Walkway Safety SLC Library Plaza Paver Replacement
Post-Bid
Salt Lake City, UT 84111

Copper Hills High School Parking Lot
Results
West Jordan, UT 84081

Median Curb
Post-Bid
UT

Elk Meadows Elementary Parking Lot
Results
South Jordan, UT 84095

11th Avenue Park Pavillion, Multi-Use Path and Signage
Post-Bid
Less than $360,000 est. value
Salt Lake City, UT

Neighborhood ADA Ramp Upgrades
Results
Midvale, UT 84047

Last Updated 09/22/2021 08:53 AM
Project Title

Slc Airport Economy Parking Lot Bus Route Reconfiguration

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT   (Salt Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will remove approximately 2,100 feet of existing 3-inch asphalt and 7-inch road base pavement and replace the pavement section with 10 inches of new Portland Cement Concrete (PCC). Work also includes the removal of eight (8) existing bus shelter stops and the installation of four (4) new bus stop shelters stops, asphalt patching, removal and reinstallation of row signs, and pavement markings.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents