Similar Projects
D/B Northeast MATOC
Design
$1,000,000 to $250,000,000 est. value

Northeast Regional Construction IDIQ (MATOC)
Design
$50,000 to $80,000,000 est. value

Air Force Contract Augmentation Program (AFCAP) V
Post-Bid

AFICA Air Force Contract Augmentation Program (AFCAP) IV
Post-Bid

Balistic Missile Defense (BMD) Program
Results

Y--IDIQ Multiple Award Global Contingency Construction Contract Navfac Area of Responsibility and Worldwide
Results
$25,000 to $500,000,000 est. value

Glasgow Park Hermitage Project Frazer House Renovations
Renovation
Construction
DE

198th Readiness Center Interiors Renovations
Renovation
Construction
Less than $1,144,000 est. value
New Castle, DE 19720

Construction IDIQ
New Construction, Renovation, Demolition
Post-Bid

Army Mechanical MATOC
Results
Less than $2,000,000 est. value

Mobile Asset Repairs and Renovations
Renovation
Post-Bid

Holloway Campus - Controls Consolidation
Results
New Castle, DE

Nationwide Prequalification
Post-Bid
$4,000,000 to $80,000,000 est. value

Stern Readiness Center Interior Renovations Phase 3
Renovation
Results
Wilmington, DE

Job Order Contracts (Joc) Region C
New Construction, Renovation
Post-Bid
$10,000,000 est. value

Reported 09/09/2019 07:35 AM
Project Title

Carvel State Office Building - Lobby Renovations

Physical Address View project details and contacts
City, State (County) Wilmington, DE 19801   (New Castle County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method
Project Status Construction Complete as of September 2019
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The project involves renovations of the lobby first and second floor at the Carvel State Office Building in Wilmington, Delaware. The scope of work shall include new entrance doors and vestibules, new raised floor, accessible ramps and steps with new finishes, new capitol police station with canopy, open stair and second floor glass railing replacement, new ceiling, lighting fixtures, and ceiling devices, new tenant space for food service, and exterior snow/ice melt system at the street entrance.
Details
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents