Similar Projects
Riverfront Park Trail - City of Billings
Infrastructure
Conception
$1,350,000 CJ est. value
Billings, MT 59101

Trail Connector from Trail Segment South of King Avenue West to TransTech Center - City of Billings
Infrastructure
Conception
$600,000 CJ est. value
Billings, MT 59101

MT Flathead 486(1), North Fork of the Flathead River, MT FLAP FLATHD 2021(1), Blankenship and Belton Stage Road Resurfacing
Infrastructure
Design
$5,000,000 CJ est. value
Columbia Falls, MT 59912

4th Avenue West and 2nd Street West Improvements
Infrastructure
Design
$2,000,000 CJ est. value
Polson, MT 59860

Northwest Billings Connector and Marathon Loop - Inner Belt Loop Phase II (Build Grant #DTOS59-20-RA-BUILD) - Schedule I
Infrastructure
Bidding
$14,000,000 CJ est. value
Billings, MT 59105

West End Water Intake and Pump Station
New Construction, Infrastructure
Bidding
$12,000,000 CJ est. value
Billings, MT 59101

Snow Plowing And Removal Services
Term Contract
Post-Bid
Helena, MT

Snow And Ice Ada Ramp Removal Services
Term Contract
Post-Bid
Helena, MT

Underpass Ave - Billings
Infrastructure
Results
$9,975,733 CJ est. value
Billings, MT 59101

Coram 200,000 Gallon Water Storage Tank
Infrastructure
Results
$1,584,606 CJ est. value
Coram, MT 59912

2022 Street Improvement Project
Infrastructure
Construction
$615,307 CJ est. value
Lewistown, MT 59457

Northwest Crossing Phase 1
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Bozeman, MT 59715

Pontiac Commercial Development
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Missoula, MT 59808

Stagecoach Trail (Rim rock Road to Highway 3) - City of Billings
Infrastructure
Conception
$3,150,000 CJ est. value
Billings, MT 59102

Story Mill Road Reconstruction From Bridger to Griffin and Bridger/ Story Mill Intersection Improvements Project
Infrastructure
Design
$300,000 CJ est. value
Bozeman, MT 59715

Last Updated 09/06/2022 05:32 AM
Project Title

Road Maintenance at Canyon Ferry/Helena Valley Regulating Reservoirs

Physical Address View project details and contacts
City, State (County) Helena, MT 59601   (Lewis and Clark County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance
Contracting Method Competitive Bids
Project Status Request for Qualifications, Construction start expected November 2022 , Construction documents
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Bureau of Reclamation's Missouri Basin Regional Office intends to solicit a Invitation for Bid (IFB) for the Road Maintenance at Canyon Ferry/Helena Valley Regulating Reservoirs, which is located in the vicinity of Canyon Ferry Reservoir located 20 miles east of Helena, Montana in Lewis and Clark and Broadwater Counties and the Helena Valley Regulating Reservoir located 7 miles east of Helena, MT. The IFB will be issued at https://beta.sam.gov under Solicitation No. 140R6022B0002. Principle features of work include the following: 1. Watering, scarifying, blading, and compacting Canyon Ferry Reservoir and Helena Valley Regulating Reservoir roads. 2. Three roads may include the application of magnesium chloride. 3. Some roads may require road mix be added to them as determined by Bureau of Reclamation (Reclamation). The Invitation for Bids (IFB) package will be available for viewing at SAM.gov on or after September 1, 2021. A Bid Opening is tentatively scheduled at 3:00PM (MDT) on September 21, 2022. Bids will be accepted via email to sgallagher@usbr.gov. The estimated price range for this acquisition is between $250,000 and $500,000. Reclamation anticipates a small business set-aside for this acquisition. The applicable North American Industry Classification System (NAICS) code is 237310 Highway, Street, and Bridge Construction, which has an associated Small Business Size standard of $39.5 million. The overall period of performance is anticipated to be 365 days with 4 Option Year periods. The contractor who receives the award is required to commence work within 10 days of receiving the Notice to Proceed. The period of performance is inclusive of receipt and acceptance of all submittals by the Bureau of Reclamation, as well as final cleanup. For further information, interested offerors should contact Contract Specialist Stormy Gallagher at email address sgallagher@usbr.gov. It is incumbent upon contractors to monitor beta.Sam.gov for RFQ release and all subsequent amendments. Effective October 26, 2018, all contractors interested in doing business with the Federal Government must be registered in the System for Award Management (SAM) database prior to submitting an offer or quotation. Note: Registering in "SAM" does not constitute an automatic award of any contract or agreement to the registering contractor. SAM is a centralized database consolidating the Central Contractor Registration (CCR), the online Representation and Certifications Application (ORCA), and the Excluded Parties List System (EPLS). Additionally, the contractor's Unique Entity ID (UEI) and banking information are required for the SAM registration. Annual confirmation of registration requirements must be accomplished through the SAM website at https://www.sam.gov. For assistance with registering in SAM, contact the Federal Services Desk at 1-866-606-8220. Payment requests for the anticipated contract are required to be submitted electronically through the U.S. Department of Treasury's Invoice Processing Platform (IPP) system. The IPP website is https://www.ipp.gov. The contractor must use the IPP website to register access and submit requests for payment. Contractor assistance with enrollment can be obtained by contacting the IPP production helpdesk via e-mail at ippgroup@bos.frb.org or by telephone at (866) 973-3131. If the contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the contractor must submit a waiver request in writing to the Contracting Officer with their proposal. The method of contractor selection has not been determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents