Similar Projects
Y1da--Replace Condensate Tank Design Build DB
Term Contract
Design
$500,000 to $1,000,000 est. value
Gainesville, FL 32608

Construction of Aviation Skid Mounted Fuel System
Alteration
Design
Ochopee, FL

Inspection, Maintenance, and Repair Services for Diesel Fuel Tanks
Infrastructure
Bidding
Sunrise, FL

East Water Treatment Plant Fuel Tank Replacement (Design/Build Project)
Infrastructure
Bidding
Plantation, FL 33317

Replace Fuel Tanks Patrick AFB FL
Post-Bid
$10,000,000 to $25,000,000 est. value
Cocoa Beach, FL 32931

Assetworks Fuel System (Fuelfocus), Inspection and Repair
Term Contract
Post-Bid
Less than $95,000 est. value
West Palm Beach, FL 33415

Maintenance, Testing and Repairs of Fuel Systems
Term Contract
Results
Less than $2,700,000 est. value
Orlando, FL 32801

Fuel Tank Repair at Brooksville Operations Center
Results
Brooksville, FL 34604

Upgrading of Fuel Depot at Miramar`s Wastewater Reclamation Facility
Alteration
Bidding
Miramar, FL 33027

Northwest Water Reclamation Facility, Bleach Tank Replacement
Post-Bid
Saint Petersburg, FL 33710

Pre-Qualification of Vendors for Maintenance and Repair of Fuel Systems Equipment
Term Contract
Results
Less than $150,000 est. value
Belle Glade, Pahokee, West Palm Beach, FL

Diesel and Unleaded Fuel Polishing and Tank Cleaning
Post-Bid
Port Saint Lucie, FL

Compressed Natural Gas (CNG) Fast Fill Upgrade
Results
$754,616 est. value
Saint Petersburg, FL

Stainless Steel Fuel Storage Tanks, Purchase and Delivery
Post-Bid
Palm Beach, FL

Chemical Injection Pipeline Cleaning Services
Term Contract
Results

Last Updated 01/26/2022 09:14 AM
Project Title

Purchase and Installation of High-Density Linear Polyethylene (HDLPE) Bulk Storage Tanks

Physical Address View project details and contacts
City, State (County) North Port, FL   (Sarasota County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This section covers the supply and installation of three upright, double-wall, flat bottom high density linear polyethylene resin (e.g., HDLPE) 2,500-gallon bulk storage tank for storage of sodium hypochlorite. Two of these tanks will be delivered and installed at the Wastewater Treatment Plant site at 5355 Pan American Blvd., while the third tank will be delivered and installed at the Southwest Booster Station at 8060 S Tamiami Trail. The assembly of the tanks will consist of one cylindrical inner primary tank and one blended form octagonal outer secondary tank. The tank shall be a molded in one-piece seamless construction by rotational molding. The tank shall be designed for above-ground, vertical installation and capable of containing chemicals at atmospheric pressure. The assembly shall be designed to prevent rainwater from entering the containment tank. The design shall allow direct primary tank base retention for up to seismic zone 4 conditions per UBC code requirements. The containment tank shall be designed to hold a minimum of 115% of the normal fill capacity of the primary tank, for transfer of chemicals. The disposal of the existing tank that is to be replaced is also required.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents