Similar Projects
O'Reilly Auto Parts (NB2) / New Bern
New Construction, Infrastructure
Design
$400,000 CJ est. value
New Bern, NC 28560

2023 Storm Water Drain Pipe Replacement
Infrastructure
Bidding
$264,000 CJ est. value
Havelock, NC 28532

2023 Storm Water Drain Pipe Replacement
Infrastructure
Bidding
$264,000 CJ est. value
Havelock, NC 28532

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

P134, Construct Slocum Road Physical Security Compliance
New Construction, Infrastructure, Renovation
Post-Bid
$100,000,000 CJ est. value
Marine Corps Air Station Cherry Point, NC 28532

Lift Station 7022 Flow Meter
Renovation
Results
$25,000 to $100,000 est. value
Cherry Point, NC 28533

2022 Sewer Line and Manhole Repair at 113 Berkshire Drive
Infrastructure
Results
$35,000 CJ est. value
Havelock, NC 28532

New Bern Boat Storage
New Construction, Infrastructure
Construction
$437,135 CJ est. value
New Bern, NC 28562

Hatteras Yachts Expansion / New Bern
Addition, Demolition, Infrastructure, Renovation
Pending Verification
$34,000,000 CJ est. value
New Bern, NC 28560

Milling, Resurfacing, and Shoulder Reconstruction - US 70
Infrastructure
Bidding
$4,000,000 CJ est. value
Havelock, NC 28532

Lawson Creek Booster Station Replacement
Renovation, Infrastructure
Post-Bid
$150,000 CJ est. value
New Bern, NC 28562

2022 Paving Maintenance Bid
Infrastructure
Results
$924,854 CJ est. value
Havelock, NC 28532

Lawson Creek Park Marshwalk Extension Project Phase 3
Infrastructure
Bidding
$580,000 CJ est. value
New Bern, NC 28562

Addition to Building 4841 at the Marine Corps Air Station
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$10,000,000 CJ est. value
New Bern, NC 28560

Craven County Human Services Complex New Addition
Addition, Demolition, Infrastructure
Results
$270,000 CJ est. value
New Bern, NC 28562

Last Updated 09/19/2023 12:32 AM
Project Title

Duffyfield Community Stormwater Enhancements Project Phase 1

Physical Address View project details and contacts
City, State (County) New Bern, NC 28560   (Craven County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $205,800 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Duffyfield Community Stormwater Enhancements Project Phase 1 The scope of work for Phase 1 of the Duffyfield Community Stormwater Enhancement Project includes the completion of a of a new stormwater pump station and the installation of approximately 2,330 linear feet of 12 inch diameter force main and a stilling well outfall. The pumpstation is located at the northwest corner of an existing detention pond at the intersection of Biddle St and E Rose St. The force main will be installed along the southern side of E Rose Street until it crosses under E Rose Street just west of Garden Street where it will discharge via a stilling well on the north side of the East Rose Street to an un-named tributary of Jack Smith Creek.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents