Similar Projects
Hot-Mix Asphalt Surface Course
Infrastructure
Bidding
Crystal Lake, IL

Reclamite Asphalt Rejuvenator and CRF Restorative Seal
Post-Bid
Johnsburg, IL

Central Division - Asphalt Paving Maintenance
Post-Bid

Harmony Road Bridge Repairs
Renovation
Results
$93,995 est. value
Marengo, IL 60152

Union Pacific/Cary Maintenance Garage Site Preparation Improvements
Renovation
Results
Cary, IL 60013

Amazon Distribution Center and Office Warehouse
New Construction - 673,186 SF
Construction
$100,000,000 est. value
Huntley, IL 60142

2021 HMA Materials Only
Post-Bid
McHenry, IL

(2.578-Mile) Improvement on Il-120 (Belvidere Road) From Mchenry Co. Line to East of II-60 Consist of Sealing Cracks and Joints in the Existing Concrete Pavement, Restriping Pavement Marking
Results

2021 Asphalt Purchase
Post-Bid
IL

Ramp Construction
New Construction
Results
Less than $2,421,144 est. value

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

2021 Road Resurfacing Program
Results
Cary, IL

Hebron Road Pavement Improvements
Infrastructure
Post-Bid
Hebron, IL

Wonder Woods Subdivision And Wonder Woods Drive Road Improvements
Results
McHenry, IL

Road Reconstruction
Infrastructure
Post-Bid
Union, IL 60180

Last Updated 09/22/2021 10:14 AM
Project Title

School Road Resurfacing

Physical Address View project details and contacts
City, State (County) Ringwood, IL   (McHenry County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

0.42 miles; Consists of resurfacing with hot-mix asphalt surface course, polymerized binder course, hot-mix asphalt surface removal, aggregate shoulders and all necessary collateral work to construct the improvements. Roadway resurfacing including 4,503 pounds of Bituminous Materials (Tack Coat), 810 tons of Hot-Mix Asphalt Surface Course, IL-9.5, Mix D, N50, 400 tons of Hot-Mix Asphalt Polymerized Binder Course, IL-4.75, N50, 9,304 feet of Thermoplastic Pavement Markings, and 6,670 square yards of Hot-Mix Asphalt Surface Removal and other related work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents