Similar Projects
Last Updated | 10/27/2021 10:05 AM |
Project Title | Waterfront Access and Flood Protection Improvements |
Physical Address | View project details and contacts |
City, State (County) | Swampscott, MA (Essex County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Site Development |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $394,900 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work includes site improvements to two access ways to beaches along Swampscotts coastline including (from west to east) Cassidy Park and Phillips Beach. Each site improvement generally consists of sand dune amendment and restoration, and planting of beach grasses and shrubs. Additional installation features (at one or more locations as noted on the drawings) include installation of beach access mats, plantings, fencing, trash barrels, bike racks, granite marker, concrete plaza with water station, and an outdoor shower. Work includes site preparation; grubbing and stripping of vegetation; and removal, storage and reinstallation of select existing beach signs |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |