Similar Projects
Construction Manager-at-Risk for the Rudder High School Additions
Addition
Bidding
Bryan, TX 77808

George A. Thompson Intermediate School(Base Bid)
New Construction - 160,267 SF
Bidding
Less than $38,250,000 est. value
Pearland, TX 77089

Construction Manager at Risk for the Alvin Independent School District's High School 4
New Construction - 500,000 SF
Post-Bid
Less than $126,500,000 est. value
Alvin, TX

Jubilee Westwood School
Renovation
Post-Bid
San Antonio, TX 78227

IDEA South Flores Campus - Phase IV
Addition, Demolition - 4,000 SF
Results
Less than $2,667,697 est. value
San Antonio, TX 78221

Renovation of the Bandera Middle School Stadium Field House
Renovation
Results
Bandera, TX 78003

EC Mason Elementary School Replacement
New Construction - 103,000 SF
Construction
Less than $20,140,000 est. value
Manvel, TX 77578

Killeen ISD High School #6
New Construction - 43,000 SF
Construction
Less than $20,350,733 est. value
Killeen, TX 76540

George A. Thompson Intermediate School (Alternates)
New Construction - 160,267 SF
Bidding
Less than $38,250,000 est. value
Pearland, TX 77089

Killeen High Renovation and Modernization Phase 1
Renovation, Addition - 320,000 SF
Post-Bid
Less than $42,439,000 est. value
Killeen, TX 76543

Randolph Elementary School Replacement
Demolition - 39,000 SF
Results
Less than $13,400,000 est. value
Universal City, TX 78148

AG Barn and Related Site Improvements
New Construction - 13,000 SF
Construction
Less than $1,405,850 est. value
Sealy, TX 77474

Edna Bigham Mays Elementary Additions and Renovations
Renovation, Addition
Post-Bid
Troy, TX 76579

Pearland Jr.High East Kitchen Renovation
Renovation
Results
Pearland, TX 77581

Administration Replacement and Cafeteria Upgrades at Pat Neff Middle School
Construction
Less than $11,200,000 est. value
San Antonio, TX 78238

Last Updated 05/14/2021 10:39 AM
Project Title

Pre-Construction Services for New Godley Elementary School 3 and Godley High School Phase 2

Physical Address View project details and contacts
City, State (County) Godley, TX 76044   (Johnson County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $80,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

New Elementary School #3 – New 110,000SF two-story elementary school for grades PK-5 within the Silo Mills development off FM 917. Estimated budget: $30,900,000. Godley High School (Phase 2) – Multiple additions totaling 150,000SF will be added to increase overall campus capacity to 1,200 students. Estimated budget: $49,100,00.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents