Similar Projects
Overland Park Arboretum Nature Trail - City of Overland Park
Infrastructure
Conception
$3,050,000 est. value
Bucyrus, KS 66013

Nall 58
New Construction, Infrastructure
Design
$30,000,000 est. value
Mission, KS 66202

Nall 58
New Construction, Infrastructure
Design
$30,000,000 est. value
Mission, KS 66202

2021 Drainage Repair Program
Infrastructure
Bidding
$600,000 est. value
Prairie Village, KS

Moonlight Sidewalk
Post-Bid
Gardner, KS

Parks and Recreation Design and Installation for Custom Play Equipment
New Construction
Post-Bid
Overland Park, KS

Road Construction, Moonlight Road
Results
KS

Road Construction, East of Mission Road
Results
KS

Coca Cola Trailer Parking
New Construction
Pending Verification
Lenexa, KS

The Rocks
LEED Certification, New Construction, Infrastructure - 35,000 SF
Pending Verification
$50,000,000 CJ est. value
Roeland Park, KS 66205

Metcalf Avenue Mixed-use Project
New Construction - 19,559 SF
Design
$135,000,000 est. value
Overland Park, KS 66209

Mill Creek Trail Improvements 2021
Infrastructure
Post-Bid
Lenexa, KS

2021 Cars 50th Street and Stateline Road
Results
$100,365 est. value
Westwood Hills, KS

Archers Landing at Sundance Ridge Third Plat
New Construction, Infrastructure
Pending Verification
$180,000,000 CJ est. value
Overland Park, KS 66204

Aspire
New Construction - 493,000 SF
Design
$575,100,000 est. value
Overland Park, KS 66251

Last Updated 07/28/2022 01:03 PM
Project Title

R Park Phase 3 Park Improvements

Physical Address View project details and contacts
City, State (County) Roeland Park, KS 66205   (Johnson County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $273,463 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of the installation of a new playground, relocate playground equipment, install sidewalks and a bike trail around the park. Direct all questions to Greg Van Patten at greg.vanpatten@lamprynearson.com or by phone at 816-823-7331

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents