Similar Projects
Howard Family Trail Bridge Repair 2022
Infrastructure
Bidding
$400,000 CJ est. value
Saint Joseph, MI 49085

Hot Mix Asphalt Surface Reconstruction, Concrete Curb, Gutter, Sidewalk and Ramps, Guardrail and Pavement Markings on Riverside Drive/Paw Paw Avenue
Infrastructure
Bidding
$713,000 CJ est. value
Watervliet, MI 49098

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Smith Court Water Main Improvements Project
Infrastructure
Post-Bid
Benton Harbor, MI 49022

E Napier Avenue & Dewey Avenue 400' West of S. Euclid Ave. to Dewey Ave. and Dewey Ave. from Napier Ave. to 1,700' South
Results
Benton Harbor, MI

Colfax Avenue & Messner Drive, Napier Avenue to Eloise Drive
Results
Benton Harbor, MI

Cornerstone Alliance - Industrial Park Stormwater Project
New Construction
Construction
Benton Harbor, MI 49022

Wastewater System Improvements Francis Avenue, Eastman Avenue, Britain Avenue & Crystal Avenue
Infrastructure
Post-Bid
Benton Harbor, MI 49022

2021 Water Service Replacement
Infrastructure
Results
Benton Harbor, MI

Water Service Investigations
Alteration
Post-Bid
Saint Joseph, MI

High Lead Sample Results Project
Infrastructure
Results
$643,640 est. value
Saint Joseph, MI

Hot Mix Asphalt Cold Mill, Crush, Shape and Resurface, Concrete Curb and Ramps, Sewer and Pavement Markings on Lemon Creek Road
Infrastructure
Post-Bid
$539,969 CJ est. value
Baroda, MI 49101

Water and Wastewater System Improvements Euclid Avenue and Highland Avenue
Infrastructure
Results
Benton Harbor, MI 49022

Wastewater System Improvements Crystal, Highland, and Vashti Sewer Reconfiguration
Infrastructure
Results
Benton Harbor, MI 49022

City-Wide Water Service Replacement Project
Infrastructure
Results
Benton Harbor, MI

Last Updated 09/22/2022 02:33 PM
Project Title

Creek Drive Water Main Replacement

Physical Address View project details and contacts
City, State (County) Michiana, MI 49117   (Berrien County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Work comprises furnishing all labour, materials, equipment, supplies and services to complete of a new six (6") water main in Creek Drive, from Chickagami Trail to Grand Beach Road all in the Village of Michiana, Michigan and as defined in the Contract Documents. The Bidding and Contract Documents, including Bidders Procedure Checklist for Construction Services, Official Notice to Bidders, Instructions to Bidders, Bid Proposal Form, Form of Bid Bond, Agreement, Form of Performance Bond, Form of Payment Bond, General Conditions, Supplementary Conditions, Specifications, Drawings and Addenda, if any, may be examined on line at www.mcbiddocs. com. Each Bid must be accompanied by a certified or cashier's check on a solvent bank or trust company, drawn to the order of the City of Michigan City, Indiana or an acceptable Bid Bond, in an amount of not less than ten percent (10%) of the total Bid for the Project. This sum is a guarantee that, if the Bid is accepted, a contract will be entered into, and its performance properly secured. Bid security of all excepting the three lowest, responsive, responsible Bidders will be returned within thirty (30) days after the opening of bids. Any Bidder whose Bid security has been retained may, after thirty (30) days from the opening of Bids, request return of his Bid security provided he has not been notified of acceptance of his Bid. The Bid security of the successful Bidder will not be returned until Bidder delivers the required Performance Bond. Any Bid may be withdrawn prior to the scheduled time for the opening of Bids or authorized postponement thereof. However, no Bid may be withdrawn for sixty (60) days after the scheduled time for opening, unless agreed to by the OWNER. The award of the contract, if any, will be made by the OWNER. In determining who is the lowest, responsive, responsible Bidder, the OWNER will consider the Bid, and all other relevant facts or matters mentioned in the Contract Documents or which the Board may legally consider in determining the lowest, responsive, responsible Bidder. The OWNER reserves the right, after all Bids have been examined and tabulated, to waive any informalities and insubstantial defects in any Bid; to accept the Bid which it deems is the most responsive, and responsible, and most favourable to the interests of the Commission; and to reject any and all of the Bids received. All Bid awards are made subject to an appropriate contract being finalized between the Commission and the winning Bidder. Questions about the drawings and specifications should be directed to the owner's representative, Mr. Jeffery D Wright., P.E., email address: jwright@hassllc.com.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents