Similar Projects
Dewatering Building Rehabilitation
Infrastructure
Bidding
$700,000 CJ est. value
Oklahoma City, OK 73102

2023 Capital Improvements Project
Infrastructure
Bidding
$400,000 CJ est. value
Glenpool, OK 74033

Oklahoma Community College Hands Free Fixture Upgrade
Alteration
Post-Bid
Oklahoma City, OK 73159

Hot Tub Replacement
Alteration
Post-Bid
Oklahoma City, OK

Courthouse Water Fountain Project
Alteration
Results
Oklahoma City, OK 73102

Site and Building
Infrastructure, Alteration
Results
Norman, OK

Piping Repair and Replacement Services
Alteration
Post-Bid
Norman, OK

Plumbing and Gas Line Repair
Alteration
Results
$300,000 est. value
Oklahoma City, OK

Plumbing Repair and Maintenance Services for Interior and Exterior
Alteration
Post-Bid
$30,000 est. value
Oklahoma City, OK

Installation of Insertion Valves Ranging
Alteration
Results
$90,000 est. value
McAlester, OK

Plumbing Contractor 2022-2023
Alteration
Post-Bid
Muskogee, OK

Fiberglass Bulk Chemical Tank Repair at Mohawk Water Treatment Plant
Infrastructure
Results
$63,673 CJ est. value
Tulsa, OK 74115

CHIC 313113 - Pavement Improvements
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Sulphur, OK 73086

Automated Meter System (Electric and Water)
Renovation
Results
$2,098,284 CJ est. value
Blackwell, OK 74631

On Call Plumbing Repairs
Term Contract
Post-Bid
Oklahoma City, OK 73102

Last Updated 07/06/2023 05:03 PM
Project Title

Relocation of Steel Storage Standpipe and Waterline

Physical Address View project details and contacts
City, State (County) Ninnekah, OK 73067   (Grady County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $257,150 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

CONTRACT #1 - WATER STORAGE STANDPIPE BASE BID - CIRCLE P WELDING - $ 321,339.00 CONTRACT #2 - WATERLINE - M&T SEPTIC AND BACKHOE SERV - $ 257,150.00 Relocation of an existing 10 x 100 Steel Storage Standpipe to the new location with new foundation, additional cost steel wall and sand blast and paint Funding for this project is provided through American Rescue Plan Act (ARPA) grant program. As such, compliance with Labor Standards Contract Provisions is mandatory. Compliance with the Davis Bacon Act is mandatory if the total project cost exceeds $10,000,000 (ten million dollars). All bids received at said time will be opened and evaluated for completeness and correctness. All work shall be performed, and all construction and materials used and furnished shall be in accordance with the Plans and Specifications prepared by Fox Engineering, Inc. , and on file in the office of Grady County RWD #7 - Ninnekah, Oklahoma Each bidder shall accompany his original bid, filed with the State of Oklahoma, with a certified or Cashiers Check on a solvent bank located in Oklahoma, or a Bidders Bond, in the amount of five (5) percent of the amount bid, as a guarantee of his ability to perform the contract bid upon, and that he will enter into a written contract with the Owner to perform said work and/or furnish said materials in accordance with said Plans and Specifications, and furnish the required bonds according to the Public Competitive Bidding Act of 1974. The Owner will retain the deposit for liquidated damages in case the successful bidder fails to enter in said contract and furnish the required bonds provided for in the specifications within the time required. Deposit of the unsuccessful bidders will be returned upon the execution of the Contract and required bonds. Each bidder shall accompany his bid with a sworn statement in writing that the bidder has not directly or indirectly entered into an agreement, expressed or implied, with any other bidder concerning the price or amount of such bid or any bids, the limiting of the bids or bidders, the paying to anyone any money for promotion expenses, the parceling or farming out to any bidder or bidders or other persons of any part of the contract or any part of the subject matter of the bid or of the profits thereof. Construction, Maintenance and Statutory Payment Bonds in the amount of 100% of the contract price are required for this project. These bonds must be obtained from a Corporate Surety licensed in Oklahoma and approved by the Owner and Consulting Engineer. The bidder shall state in the proposal the name and address of the Surety or Sureties who will sign this bond in case the contract is awarded. The Maintenance Bond required will guarantee the repair of all damage due to improper materials or workmanship for a period of one (1) year after the acceptance of the work by the Owner.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents