Similar Projects
Oak Hill Tank Replacement - City Of Petaluma -
New Construction, Demolition, Infrastructure
Conception
$4,000,000 est. value
Petaluma, CA

Storage Tank Cleaning And Coating - WT26UT01 - City of Napa
Term Contract
Conception
$450,000 est. value
Napa, CA

La Cresta Tank Replacement - C67402122 - City Of Petaluma
New Construction, Infrastructure
Design
$2,000,000 est. value
Petaluma, CA 94952

Sunnyvale Cleanwater Program Secondary Treatment and Dewatering and Sunnyvale Cleanwater Program Existing Plan Rehabilation Project
Infrastructure
Bidding
$250,000,000 est. value
Sunnyvale, CA

Alco Park Utility Storage Tank Removal Project
Alteration
Bidding
$250,000 est. value
Oakland, CA 94612

USCG Novato Demolish Water Tower and Building 125 Pump House
Demolition
Post-Bid
$250,000 to $500,000 est. value
Novato, CA

Tanks, Sumps and Accessories
Infrastructure
Post-Bid
West Sacramento, CA

Skyline Water Tank Replacement Project
Infrastructure
Results
Millbrae, CA 94030

Aboveground and Underground Storage Tanks Monitoring, Maintenance, Testing, and Repair Services
Term Contract
Results
Less than $500,000 est. value
Redwood City, CA 94063

Storage Tank Cleaning And Coating - WT24UT02 - City of Napa
Infrastructure
Conception
$450,000 est. value
Napa, CA 94558

SCWP - Secondary Treatment and Thickening/Dewatering - CAS Stage 1
Infrastructure
Bidding
$250,000,000 est. value
Sunnyvale, CA 94089

Kern County Sheriff Lerdo Water Tank Replacement
Infrastructure
Post-Bid
Bakersfield, CA 93308

FWTP Backwash Tank Interior Cleaning
Term Contract
Results
$450,000 est. value
Sacramento, CA

Storage Tank Cleaning And Coating - WT25UT01 - City of Napa
Infrastructure
Conception
$450,000 est. value
Napa, CA 94558

Randall-Bold Water Treatment Plant Chemical Storage Improvements, Phase 2
Renovation
Bidding
$1,548,200 est. value
Oakley, CA 94561

Last Updated 06/22/2022 01:57 PM
Project Title

Lilac Tank Repair - CP76300020 - City of Simi Valley

Physical Address View project details and contacts
City, State (County) Simi Valley, CA   (Ventura County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected June 2025
Bids Due View project details and contacts
Estimated Value $1,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a water / sewer project in Simi Valley, California. Conceptual plans call for site work for a water / sewer project. This project would replace the 126,000 gallon capacity Lilac Tank that has been in service since 1991. The Waterworks Facilities Assessment conducted by Carollo Engineers in 2015 recommended to fill the voids below the tank perimeter with a flowable fill material to reinforce the structure, replace the tank level gauge, replace/restore the tank sub-base confinement with a new confinement ring, and investigate and repair the two tank leaks. In addition, the Seismic Evaluation of Waterworks Storage Tanks, conducted by Kennedy Jenks Consultants in 2020, recommended to lower the water level in the tank to prevent damage from water movement during a seismic event, which would reduce capacity to 74.000 gallons. Staff recommends to construct a new 750,000 gallon welded steel tank to replace the existing tank to provide additional storage for the region, in case of emergency. Design is anticipated to be completed in May 2025 and constuction completed in March 2026. As of June 21, 2022, this project is currently in the FY 2023-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2022. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents