Similar Projects
Margate Park Improvements - City of Daly City
Infrastructure
Conception
$5,000,000 est. value
Daly City, CA 94015

East Hillsdale and Foster City Boulevards Median Refurbishment - PK-03 - City of Foster City
Alteration
Conception
$500,000 est. value
Foster City, CA 94404

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Hawes Park Synthetic Turf Field Replacement Project
Infrastructure
Design
$944,710 CJ est. value
Redwood City, CA 94061

Bowditch Middle School New Drama and Science Buildings
New Construction, Infrastructure
Bidding
$1,200,000 CJ est. value
Foster City, CA 94404

Light Tree Sanitary Sewer Replacement Project
Infrastructure
Bidding
$1,691,120 CJ est. value
East Palo Alto, CA 94303

Jefferson Union High School District District Office and Adult Education Buildings - LLB Project
New Construction, Infrastructure - 68,000 SF
Sub-Bidding
$18,500,000 CJ est. value
Daly City, CA 94015

Jefferson Union High School District District Office and Adult Education Buildings - LLB Project
New Construction, Infrastructure - 68,000 SF
Sub-Bidding
$18,500,000 CJ est. value
Daly City, CA 94015

Smooth Streets Program
Infrastructure
Post-Bid
San Mateo, CA

Parking Lot Sweeping and Pressure Washing and/or Steam Cleaning Services at the Daily City DMV Field Office
Term Contract, Infrastructure
Post-Bid
Daly City, CA 94015

Citywide Street Reconstruction Phase 2
Infrastructure
Results
$1,600,000 est. value
San Mateo, CA

2020-21 Community Development Block Grant Project
Infrastructure
Results
$1,800,000 est. value
San Mateo, CA

South ECR WMR, Phase 1 Sanchez to Barroilhet - City of Burlingame
Infrastructure
Construction
$5,113,000 est. value
Burlingame, CA

Millbrae Serra Station
New Construction, Infrastructure - 294,000 SF
Pending Verification
$460,000,000 CJ est. value
Millbrae, CA 94030

Millbrae Serra Station
New Construction, Infrastructure - 294,000 SF
Pending Verification
$460,000,000 CJ est. value
Millbrae, CA 94030

Last Updated 08/22/2022 10:05 AM
Project Title

Mission Street Streetscape Improvements

Physical Address View project details and contacts
City, State (County) Daly City, CA 94014   (San Mateo County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $296,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes the removal of existing thermoplastic swiping and markings, crack sealing, asphalt concrete deep-lift repairs, street ekaning, application of slurry seal, installation of thermoplastic striping and markings, and adjustment of utility manhole frames and covers, utility boxes, and monument boxes to finished grade. Bids shall be accompanied by a bid bond, cash, certified or cashier's check payable to City of Daly City, in an amount not leas than 10% of the aggregate bid. A valid Class A license or other combination of any Class C licenses that constitutes a majority of the contract work must be in the possession of the Aiccessful bidder at the time the bid is submitted. The time limit for the completion of work is one hundred and twenty-five (12$) working days. The first day of this time period will he no later than the 28* calendarday after the contract award. In accordance with the California Labor Code, general prevailing hourly rates of per diem wages shall be paid on this project. California Labor Code Section 1771.1. (a) A contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defused in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5. It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded. Pursuant to the California Public Contract Code, securities may be substituted for money withheld to insult contract performance. The City reserves the right to reject any or all bids and to waive any informality in such bids and, if awarded, to award the contract in the best interest of the City. Questions should be directed to the office of the City Engineer, attention Roland Yip, Project Manager, 333-90th Street, Daly City, California 94015, telephone (650)991-8064, Fax (650) 991-8243. Bidders may obtain Bidding Documents at a cost from Barker Blue Digital Imaging by calling (650) 696-2100, toll free at (866) 347-1011, faxing at (650) 696-2199, or cmailing plans@barkerblue.awn. Please present a hard copy of pages 00300(1) through 00490, with original wet signatures, to the City Clerk's office if you will be submitting a bid The time of completion established for Contract work is one hundred and twenty-five (125) working days.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents