Project Title | Osakis Water Tower Improvements |
Physical Address | View project details and contacts |
City, State (County) | Osakis, MN 56360 (Douglas County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Storage/Water Tanks |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected August 2023 |
Bids Due | View project details and contacts |
Estimated Value | $494,980 [brand] Estimate |
Plans Available from | Civil Engineer - 06/13/23 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Interior Structural Improvements o Replace 24" manway gasket o Grind off weld spatter and erection scab marks below HWL o Install Submersible Mixer . Interior Wet Coating o Abrasive blast all reservoir surfaces o Coat all reservoir surfaces with zinc/epoxy system . Interior Dry Structural Improvements o Install new 18"x24" manway in drywell tube o Replace existing bowl drain valve o Replace light fixture on interior of dry riser o Temporarily remove insulation and aluminum jacketing from inlet pipe to facilitate abrasive blasting and painting of pipe. Reinstall after coating is complete. o Install openings with cover plates in the center of each of the two (2) platform floors, including condensate ceiling. o Relocate drain as required in condensate floor . Interior Dry Coating o Abrasive blast all reservoir surfaces o Coat all reservoir surfaces with zinc/epoxy system . Exterior Structural Improvements o Install anchor point on exterior (roof side) of drywell tube o Install separate aircraft warning obstruction light bracket next to hand rail o Remove existing light near vent and replace with double aviation light. Grind roof plate smooth at removed light bracket location. o Install weather proof plugs in unused antenna cable couplings on top of drywell tube. Plug holes or install bolts in holes in side of drywell tube. o Replace 24" diameter bolted access manway with 24" diameter hinge covered roof access manway. o Install one (1) 24" diameter hinge covered roof ventilation manway. o Replace existing handrail system with new pipe style handrail system in conformance with OSHA and AWWA regulations. o Clean debris from overflow pipe screen. . Exterior Coating o Abrasive blast (SSPC-SP-6) all reservoir surfaces o Coat all reservoir surfaces with zinc / epoxy / urethane / fluoropolymer system. Submit questions to Seth Hayek, Nero Engineering, shayek@neroeng.com, (612) 280-3890. |
||||||||||||||
Details |
|
||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |