Similar Projects
CSAH 24 Grading
Infrastructure
Bidding
$4,000,000 CJ est. value
Alexandria, MN 56308

Grading and Aggregate Base
Infrastructure
Bidding
$1,400,000 CJ est. value
Alexandria, MN 56308

Woodland Dentistry / Alexandria
New Construction, Infrastructure - 10,518 SF
Post-Bid
$6,100,000 CJ est. value
Alexandria, MN 56308

Alomere Health Rehab Services - BP 1
New Construction, Infrastructure - 28,581 SF
Post-Bid
$3,500,000 CJ est. value
Alexandria, MN 56308

Knute Nelson Field Improvements
Infrastructure
Results
$396,800 CJ est. value
Alexandria, MN 56308

2023 TH29 Sidewalk Extension
Infrastructure
Results
$533,161 CJ est. value
Alexandria, MN 56308

Lake Geneva Camper Housing
New Construction, Infrastructure, Renovation
Construction
$60,000 CJ est. value
Alexandria, MN 56308

Vermont Lake Access Road Improvements
Infrastructure
Bidding
$500,000 CJ est. value
Miltona, MN 56354

Alexandria Clinic West Parking Lot
Infrastructure
Post-Bid
$250,000 CJ est. value
Alexandria, MN 56308

2023 Alexandria Local Street Improvements
Infrastructure
Results
$409,580 CJ est. value
Alexandria, MN 56308

Alexandria Apartments
New Construction, Infrastructure - 34,000 SF
Post-Bid
$9,000,000 CJ est. value
Alexandria, MN 56308

2023 Rosewood Lane Regional Stormwater Facility
Infrastructure
Results
$207,218 CJ est. value
Alexandria, MN 56308

dupeAlomere Health Rehab Services Bid Package 02
New Construction, Infrastructure
Post-Bid
$3,000,000 CJ est. value
Alexandria, MN 56308

Indian Lake PWA Parking Lot Graveling
Infrastructure
Results
$21,800 CJ est. value
Garfield, MN 56332

Brandon-Evansville Schools Additions and Renovations Bid Package 3 - To Completion
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$6,500,000 CJ est. value
Evansville, MN 56326

Last Updated 07/03/2023 05:35 AM
Project Title

Osakis Water Tower Improvements

Physical Address View project details and contacts
City, State (County) Osakis, MN 56360   (Douglas County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $494,980 [brand] Estimate
Plans Available from Civil Engineer - 06/13/23
Owner View project details and contacts
Architect View project details and contacts
Description

Interior Structural Improvements o Replace 24" manway gasket o Grind off weld spatter and erection scab marks below HWL o Install Submersible Mixer . Interior Wet Coating o Abrasive blast all reservoir surfaces o Coat all reservoir surfaces with zinc/epoxy system . Interior Dry Structural Improvements o Install new 18"x24" manway in drywell tube o Replace existing bowl drain valve o Replace light fixture on interior of dry riser o Temporarily remove insulation and aluminum jacketing from inlet pipe to facilitate abrasive blasting and painting of pipe. Reinstall after coating is complete. o Install openings with cover plates in the center of each of the two (2) platform floors, including condensate ceiling. o Relocate drain as required in condensate floor . Interior Dry Coating o Abrasive blast all reservoir surfaces o Coat all reservoir surfaces with zinc/epoxy system . Exterior Structural Improvements o Install anchor point on exterior (roof side) of drywell tube o Install separate aircraft warning obstruction light bracket next to hand rail o Remove existing light near vent and replace with double aviation light. Grind roof plate smooth at removed light bracket location. o Install weather proof plugs in unused antenna cable couplings on top of drywell tube. Plug holes or install bolts in holes in side of drywell tube. o Replace 24" diameter bolted access manway with 24" diameter hinge covered roof access manway. o Install one (1) 24" diameter hinge covered roof ventilation manway. o Replace existing handrail system with new pipe style handrail system in conformance with OSHA and AWWA regulations. o Clean debris from overflow pipe screen. . Exterior Coating o Abrasive blast (SSPC-SP-6) all reservoir surfaces o Coat all reservoir surfaces with zinc / epoxy / urethane / fluoropolymer system. Submit questions to Seth Hayek, Nero Engineering, shayek@neroeng.com, (612) 280-3890.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents