Similar Projects
2801 Windy Ridge Parkway
New Construction
Conception
Smyrna, GA

East Decatur Station
New Construction - 396,200 SF
Conception
$10,000,000 CJ est. value
Decatur, GA

Element Hotel
New Construction - 103,000 SF
Design
Smyrna, GA

Element Hotel
New Construction, Demolition - 77,688 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Savannah, GA 31401

Canton Parking Deck
New Construction
Bidding
Canton, GA

E Center Event and Conference Space Project - CMAR
New Construction
Bidding
$500,000 to $1,500,000 est. value
Sugar Hill, GA 30518

Centennial Yards Pre-Construction Services
Post-Bid
Atlanta, GA

North Parking Deck
New Construction
Post-Bid
Gainesville, GA 30501

Cumming City Center Parking Deck
New Construction - 186,279 SF
Results
Less than $3,325,962 est. value
Cumming, GA 30040

General Contractor Services - 175 Piedmont North Parking Deck Repairs
Results
Less than $270,000 est. value
Atlanta, GA 30302

Plant Riverside
New Construction, Renovation - 26,000 SF
Construction
$250,000,000 est. value
Savannah, GA 31401

JW Marriott - Plant Riverside f/k/a Plant Riverside - Marriott and Mixed Use
New Construction, Renovation - 670,000 SF
Construction
$270,000,000 est. value
Savannah, GA 31401

1382 Peachtree Street
New Construction - 314,700 SF
Pending Verification
$10,000,000 CJ est. value
Atlanta, GA

Downtown Chamblee Residential
New Construction
Pending Verification
Chamblee, GA

The Wellness Cube
New Construction, Renovation, Demolition - 83,837 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Macon, GA

Last Updated 08/03/2021 03:26 PM
Project Title

Resurfacing City Hall Parking Deck

Physical Address View project details and contacts
City, State (County) Sugar Hill, GA 30518   (Gwinnett County)
Category(s) Heavy and Highway
Sub-Category(s) Parking Garage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of the removal of existing parking deck coating, repair of any damage or cracking, prep surface for new coating and install coating per manufacturer’s recommendations. Also, the project will involve the removal and prevention of Calthemites on the lower deck ceiling.

Details

1 Parking Garage, 14,300 SF Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents