Last Updated | 10/27/2022 04:12 PM |
Project Title | Camp Beauregard On-Post Distribution Resiliency Project, Camp Beauregard Training Site |
Physical Address | View project details and contacts |
City, State (County) | Pineville, LA 71360 (Rapides County) |
Category(s) | Government/Public |
Sub-Category(s) | Military Facility |
Contracting Method | Competitive Bids |
Project Status | Design Development, Request for Qualifications, Construction start expected April 2023 |
Bids Due | View project details and contacts |
Estimated Value | $50,000,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of October 27, 2022, an engineer has been selected and this project is in the design phase. Although a firm timeline for construction has not been determined, construction is not expected to start prior to April 2023. *The closed solicitation has been included below for reference: Thereafter, liquidated damages in the amount of $150.00 per day will be assessed. Further information is available from Colonel (Ret) Michael Deville, michael.p.deville.nfg@army.mil, (318)641-5909. This project consists of increasing Resilient Energy in the 1400 Block and the Building 1027 area at Camp Beauregard by relocating current power feed points from the existing power company feeds to power feeds behind Camp Beauregards On-Post distribution. The scope of work includes but is not limited to the following: 1.) Removing the existing 1400 Block power attachments from the power company's pole-mounted substation along Esler Field Road (Hwy 116) and connecting the conductors to underground conductors from a splice cabinet connected to the On-Post Distribution system. Scope requires installation of approximately 960 LF of underground, 3-phase, 15kV cable, two switching cabinets (matching the power company's approved Design), and all additional distribution equipment as required to tie into the On-Post Distribution system. The service structures south of Building 1295 near Esler Field Road (Hwy 116), two poles, and approximately 205 of overhead primary conductors will be removed. The tentative meeting date for the Louisiana Engineering Selection Board is Wednesday, April 20, 2022 at 11:00 AM in room 1-100 Louisiana Purchase Room of the Claiborne Building, 1201 North Third Street, Baton Rouge, LA 70802. The method of Contractor Selection has not been Determined at this time. |
||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |