Similar Projects
S201--644 | Canteen Hood Cleaning Phoenix VA Health Care System
Term Contract
Design
Phoenix, AZ 85012

Annual Inspection and Maintenance For Two York YVWA Chillers
Term Contract
Design
Phoenix, AZ 85040

Chiller Replacement for Meyer Montessori Elementary School
Alteration
Bidding
$500,000 est. value
Tempe, AZ 85282

Air Handler Replacement for Meyer Montessori Elementary School
Alteration
Bidding
$500,000 est. value
Tempe, AZ 85282

4410--Diagnose and Repair Boiler Safety Devices
Post-Bid
Phoenix, AZ

J041--644 Boiler Water Treatment
Post-Bid
Phoenix, AZ 85012

Qualified Select Bidders List / HVAC Mechanical Yard - Lomas Elementary
Term Contract
Results
Phoenix, AZ 85044

Qualified Select Bidders List / HVAC Mechanical Yard - Lomas Elementary
Term Contract
Results
Phoenix, AZ 85044

LDS Encanto Meeting House -- HVAC
Renovation
Construction
$450,000 est. value
Phoenix, AZ 85035

Air Handler Replacement for Meyer Montessori Elementary School
Alteration
Bidding
$500,000 est. value
Tempe, AZ 85282

Computer Room Air Conditioner (CRAC) Unit Preventive Maintenance
Post-Bid
Phoenix, AZ 85015

HVAC Units with Additional Unit(S) Purchase Option ASPC - Perryville
Results
Goodyear, AZ 85395

Cooling Tower Replacement - Palm Valley Elementary School
Alteration
Bidding
$2,000,000 est. value
Goodyear, AZ 85395

Compressor Replacement
Post-Bid
Phoenix, AZ

Dysart High School Central Plant Replacement
Results
El Mirage, AZ 85335

Reported 05/26/2022 12:00 AM
Project Title

Highland Elementary School Central Plant Upgrades

Physical Address View project details and contacts
City, State (County) Mesa, AZ 85213   (Maricopa County)
Category(s) Single Trades
Sub-Category(s) HVAC, Mechanical
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2021
Bids Due View project details and contacts
Estimated Value $100,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor to coordinate working hours with the District. Most of the work is expected to be performed during school hours unless deemed too noisy or disruptive. At that point the work would need to be performed to after school hours and weekends. The new mechanical yard work is one area that can be done during school hours (after coordinating with the school). The demo of the existing chiller, cooling tower, etc. will be done during spring or summer break when school is out. Therefore, temporary cooling is not required. Remove existing shrubs, trees, sidewalks, handrails, underground piping, and utilities in the area of the new Central Plant Yard .

Details

Division 01 - General Requirements, Facility Services Performance Requirements, HVAC Performance Requirements.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, HVAC Air Cleaning Devices, Packaged Water Chillers, Cooling Towers, Central HVAC Equipment.
Division 42 - Process Heating, Cooling, and Drying Equipment, Process Chillers and Coolers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents