Similar Projects
Locating Subsurface Facilities
Alteration
Bidding
Riverside, CA 92519

Storm Drain System Improvement
Infrastructure
Bidding
$7,946,443 est. value
San Jose, CA 95134

South Whittier Outfall Relief Trunk Sewer Rehabilitation, Phase 5
Infrastructure
Post-Bid
$8,500,000 to $12,000,000 est. value
Norwalk, CA

Storm Water Pump Repair Services In San Mateo and Santa Clara Counties
Term Contract
Post-Bid

San Andreas Road PM 1.24 and 1.30 Browns Valley Road PM 2.14 and Mt Madonna PM 0.96 Storm Damage Repair Project
Infrastructure
Results
San Andreas, CA

Sewer Main Spot Repair
Alteration
Results
$650,000 est. value
Whittier, CA 90603

Park Way CSS Improvement Project
Alteration
Bidding
$95,000 est. value
Sacramento, CA 95811

PW Various Locations Pavement Renovation No 45 and Sewer Replacement
Infrastructure, Alteration
Post-Bid
$6,300,000 est. value
San Francisco, CA 94103

Interstate 10 Sewer Crossing
Infrastructure
Results
Yucaipa, CA 92399

Construct Storm Water Treatment Devices and Imported Borrow
Infrastructure
Bidding
$4,900,000 est. value
CA

Storm Water Pumps and other Related Plumbing Plant Services in Orange County
Term Contract
Post-Bid
CA

Gold Flat Campground Upgrades
Renovation
Results
$700,000 to $1,100,000 est. value
Oroville, CA 95966

Storm Water Pumps and Other Related Plumbing Plant Services
Term Contract
Bidding
CA

Wastewater, Water, And Landfill Systems Consulting Services
Infrastructure
Post-Bid
CA

WRCRWA Anaerobic Digester #3
Infrastructure
Results
$4,800,000 est. value
Corona, CA 92880

Last Updated 10/28/2021 08:51 AM
Project Title

Construction Of District 5 Interceptor Sewer Rehabilitation Phase 1

Physical Address View project details and contacts
City, State (County) Torrance, CA   (Los Angeles County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,600,000 to $3,900,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the rehabilitation of approximately 2,950 feet of 54-inch reinforced concrete pipe (RCP) with cured-in-place pipe (CIPP) liner and seven (7) manholes and structures with a protective coating system on the District 5 Interceptor Trunk Sewer.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents