Similar Projects
The Obama Presidential Center - Bid Packages 05-043 & 05-055
New Construction - 5,000 SF
Design
$910,000 to $1,170,000 est. value
Chicago, IL 60637

Library Expansion
Renovation, Addition - 28,000 SF
Design
Mahomet, IL

Loading Dock Upgrades
Renovation
Bidding
$400,000 CJ est. value
Springfield, IL 62703

The Studio Construction - Bid Pacakges 2 - Glazing and 3 - Millwork
Renovation
Sub-Bidding
$300,000 CJ est. value
Champaign, IL 61820

Rockford Public Library
New Construction
Post-Bid
$33,000,000 est. value
Rockford, IL 61101

New Helen Plum Public Library
New Construction
Post-Bid
Lombard, IL

New Study Rooms
Results
Glendale Heights, IL

Hillsboro Public Library
Renovation
Results
Hillsboro, IL 62049

The Obama Presidential Center
New Construction - 5,000 SF
Construction
$700,000,000 to $830,000,000 est. value
Chicago, IL 60637

New Library Building and Site improvements
New Construction - 70,160 SF
Construction
$13,000,000 to $13,500,000 est. value
Galesburg, IL 61401

Imani Senior Village
New Construction, Infrastructure - 78,000 SF
Pending Verification
$22,000,000 CJ est. value
Chicago, IL 60628

Team Pioneros
Renovation, Addition - 64,317 SF
Pending Verification
$53,900,000 est. value
Chicago, IL 60639

Public Library Building Construction
New Construction
Design
$5,000,000 est. value
Vandalia, IL

The Obama Presidential Center - Bid Packages 8.24.21
New Construction - 5,000 SF
Post-Bid
$13,950,000 to $20,433,000 est. value
Chicago, IL 60637

Aspen Drive Library Drive-Thru Window & Bookdrop
Renovation
Results
Vernon Hills, IL 60061

Last Updated 09/16/2022 01:04 PM
Project Title

Improvements at the Shorewood-Troy Public Library

Physical Address View project details and contacts
City, State (County) Shorewood, IL 60404   (Will County)
Category(s) Government/Public
Sub-Category(s) Library - Public
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $60,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The work is to be performed in accordance with the Construction Documents as prepared by Ethos Workshop Architects, 105 West Jackson Avenue, Suite 2, Naperville, Illinois 60540. Construction Documents will be issued electronically to qualified bidders only. All bidders will be required to submit a Bid Security in the form of a Bid Bond, Certified Check, or Cashier's Check in the amount of Ten Percent (10%) of the Base Bid, payable to the Shorewood-Troy Public Library. Successful bidders will be required to furnish a Performance Bond and a Labour and Material Payment Bond. The Shorewood-Troy Public Library reserves the right to reject any and all proposals, parts of any and all proposals or to waive technical errors or omissions in submitted proposals. No submitted bid may be withdrawn until a period of sixty (60) days after the bid opening date, without written consent of the Shorewood-Troy Public Library. The Contract shall be subject to the provisions of the Prevailing Wage Act (820 ILCS 130/1 et seq.) to the extent required by law.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Roof and Deck Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Library Equipment, Library Stack Systems, Audio-Visual Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Furniture, Institutional Furniture, Library Furniture, Book Shelves, Study Carrels, Index Card File Cabinets, Portable Audience Seating, Seat and Table Assemblies.
Division 13 - Special Construction.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents