Similar Projects
Last Updated | 11/01/2021 12:11 PM |
Project Title | Replace 5 HVAC Units |
Physical Address | View project details and contacts |
City, State (County) | Carthage, TN (Smith County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | To replace 5 HVAC units. The new units will be the same tonnage as the existing units or larger. The new units will be 16 or 17 SEER units with a two-stage compressor and variable speed fan. Contractor shall install new digital thermostats with lock boxes. Contractor will install Wave air purifi ers or comparable product on all 5 new and 1 existing unit. Contractor will install a dehumidifier and new digital thermostat that has a dehumidifi cation function on the existing unit controlling the air to the pharmacy. The contractor will be responsible for disposal and clean-up of the old units. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |