Similar Projects
Fire Station #7
New Construction
Conception
$7,100,000 est. value
College Station, TX

Fire Station 1 Remodel
Renovation
Conception
$2,000,000 est. value
San Marcos, TX 78666

Fire Station 2
New Construction
Design
$4,500,000 est. value
Humble, TX 77338

New Law Enforcement Center
Addition
Design
Mansfield, TX 76063

New Fire Station 52
New Construction - 12,967 SF
Bidding
$4,500,000 est. value
Fresno, TX 77545

Schulenburg EMS Station
Renovation
Bidding
Schulenburg, TX 78956

Athens Police Building
New Construction - 17,000 SF
Sub-Bidding
Athens, TX

New Public Safety Training Center
New Construction
Post-Bid
Less than $7,000,000 est. value
Texas City, TX

Fire Station No. 5
Post-Bid
TX

Temporary Buildings and Dome Structures
New Construction - 7,700 SF
Results
$145,196 est. value
Dallas, TX 75230

Fire Station 24 Replacement Project
New Construction, Term Contract - 16,270 SF
Results
Less than $5,900,000 est. value
San Antonio, TX 78200

Fire Station 6
Construction
League City, TX

Aldine Fire Rescue Station No. 11
New Construction - 15,185 SF
Construction
Houston, TX 77032

Emergency Operations Center
Renovation
Pending Verification
Killeen, TX 76541

Fire Station 4
New Construction
Pending Verification
$5,100,000 est. value
Killeen, TX

Last Updated 04/28/2022 07:42 AM
Project Title

New Bulverde Police Head Quarters

Physical Address View project details and contacts
City, State (County) Bulverde, TX 78163   (Comal County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,563,203
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

a. The Work consists of providing all labor, materials, and equipment necessary to produce the construction required by the Bidding Documents prepared by Lopez Salas Architects, Inc. b. The Work is briefly described as a new two-story Pre-Engineered Metal Building approximately 13,578. square feet, including site improvements. The first floor is fully finished out and the second floor will be “white-boxed” for future development. c. The Work will include site work, civil and utility work, asphalt and concrete paving, concrete, Stone masonry exterior wall veneer, stucco, pre-engineered building components and erection, steel framing, metal fabrications, insulation, sealant, metal roofing, steel doors and frames, aluminum interior door frames, wood doors, aluminum storefront system, finish carpentry and casework, gypsum board, ceramic/porcelain tile, resilient flooring, tile carpet, painting, specialties, HVAC, plumbing, fire protection system, and electrical.

Details

Fire/Police Station, New Construction, Fire/Police Station, 2 Stories Above Grade, Approximately 13,578 SF New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents