Similar Projects
Pump And Well For Florence Sports Complex
Bidding
Florence, SC

Effluent Pumps Rehabilitation Project
Post-Bid
SC

Provide and Install Two New Fiberglass Sewer Tanks and Grinding Pumps at Charleston County K-9 Facility
Post-Bid
North Charleston, SC 29405

Irrigation Well/Pump Repair/Replacement
Results
Florence, SC

Mable T. Willis Boulevard Well
Results
Walterboro, SC 29488

New Well No. 4 and Raw Water Main for Water Plant No. 5
Post-Bid
Sumter, SC 29150

Replace Existing 35 Year-Old Potable Well at Waddell Mariculture Center
Results
Bowman, SC

Schwartz Wastewater Treatment Plant Philly RAS Pumps
Post-Bid
Conway, SC 29528

Well Drilling Services for the Construction of a Well at Samworth WMA
Results
Less than $29,014 est. value
Georgetown, SC 29440

Installation of Residential Wells (18 Sites)
Post-Bid
Adams Run, Edisto Island, McClellanville, Ravenel, Wadmalaw Island, SC 29449

Buck Hall Well Construction
Results
Less than $25,000 est. value
McClellanville, SC 29458

Midtown Sewer Improvements
Post-Bid
Shell Point, SC

CWS Hanahan Water Treatment Plant Pump and Motor
Results
Less than $217,761 est. value
Charleston, SC 29402

Repair Irrigation Wells
Post-Bid
Chapin, SC 29036

Well Drilling Services for the Construction of a Monitoring Well at Donnelly WMA
Results
Less than $27,555 est. value
Green Pond, SC 29446

Reported 11/29/2019 12:00 AM
Project Title

Well Pump Replacement

Physical Address View project details and contacts
City, State (County) Saint George, SC 29455   (Dorchester County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Replace 5" National Vertical Turbine Pump yielding 300GPM@235THD. Model #K8LC13 stage bowl assembly. Provide Equipment, Labor, Material To Mobilize, Set Up Pump Rig,Set 140" - 5"x1" Column Assembly. Ensure Pump Performing On Curve. Replace Parts Needing Replacement. Raise 10" Casing 1 Ft. Pour Concrete Pedastal Around Casing Re Scdhec Regulations.Adjust Discharge Piping To Match Casing Height.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents