Similar Projects
Smith Creek Watershed Recovery
Bidding
Wilmington, NC 28403

South Mayo River Flood Reduction Project Rehabilitation
Post-Bid
$500,000 to $1,000,000 est. value

Storm Drain Pipe Repairs Garden Avenue
Post-Bid
Wilmington, NC 28402

Coastal Storm Risk Management at Carolina and Kure Beach, North Carolina
Results
$10,000,000 to $25,000,000 est. value
Carolina Beach, NC

Hinton Avenue Drainage Improvements
Results
Wilmington, NC

Amber Drive Drainage Improvements
Post-Bid
Wilmington, NC 28402

Turning Basin Expansion - 2019
Results
$35,000,000 to $40,000,000 est. value
Wilmington, NC

Leachate Seep and Erosion Repair Services
Results
Wilmington, NC 28401

Headwall
Results

Multiple Region - Statewide Emergency Replace or Rehab Bridges Culverts Pipes 48-Inches or Larger in Diameter] Special Notice for Ad Purchase Directory - Emergency Express Design-Build
Results

River Road Culvert Replacement
Results
Less than $1,374,080 est. value
Wilmington, NC

Shire Lane Culvert Replacement
Results
Less than $145,810 est. value
Wilmington, NC

Storm Drain Pipe Point Repairs
Results
Wilmington, NC

New Orleans Place Drainage Improvements
Results
Wilmington, NC 28403

Headwall
Term Contract
Results
Castle Hayne, NC 28429

Last Updated 08/20/2019 04:13 PM
Project Title

Williston Middle School Drainage Improvements Due to Hurricane Florence

Physical Address View project details and contacts
City, State (County) Wilmington, NC   (New Hanover County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Due to damages caused by Hurricane Florence, the installation of new 30" storm drain to reroute the conveyance system around the school property is needed.
Details
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents