Similar Projects
South Aztec Water Transmission Line - 36372 - City of Aztec
Infrastructure
Conception
$7,000,000 CJ est. value
Aztec, NM 87410

Main Street and San Juan Boulevard Intersection Upgarde - City of Farmington
Infrastructure
Conception
$250,000 CJ est. value
Farmington, NM 87401

RFP - San Juan Lateral Water Treatment Plant (SJLWTP)
New Construction, Infrastructure
Bidding
$350,000,000 CJ est. value
Waterflow, NM 87421

FEUS Animas HydroPlantBuilding Restoration
Renovation
Bidding
$408,651 CJ est. value
Farmington, NM 87401

RFQ Contractor - El Vado Dam Spillways and Dam Crest Modification Project
Infrastructure
Post-Bid
$86,000,000 CJ est. value
Tierra Amarilla, NM 87575

Aztec Airport Improvements 2022 Runway 8-26 Lighting and Visual Aids
Infrastructure
Post-Bid
$400,000 CJ est. value
Aztec, NM 87410

Hydro Excavation, Multi-Term Contract
Infrastructure
Results
Farmington, NM

Bergin Substation Rebuild - Civil Work
Infrastructure
Results
$660,000 est. value
Farmington, NM

Broadway and Butler Intersection Upgarde - City of Farmington
Infrastructure
Conception
$250,000 CJ est. value
Farmington, NM 87401

Cedar Hill Pedestrian Bridge Rehabilitation Project
Infrastructure
Bidding
$200,000 CJ est. value
Aztec, NM 87410

Agriculture MP Site Work Project
Infrastructure
Post-Bid
$563,000 CJ est. value
Shiprock, NM 87420

Dine' College South Campus Fire Lane
Infrastructure
Results
$700,000 CJ est. value
Shiprock, NM 87420

Rehabilitate Taxiway A - Construction - City of Farmington
Infrastructure
Conception
$320,000 CJ est. value
Farmington, NM 87401

Engineering, Procurement and Construction for Bluffview Substation
New Construction, Infrastructure
Post-Bid
$17,323,590 CJ est. value
Farmington, NM 87401

Turley Manzanares Ditch Company Diversion Rehabilitation Project
Infrastructure
Results
$698,404 CJ est. value
Blanco, NM 87412

Last Updated 01/04/2023 07:31 AM
Project Title

Ancient Trails 12KV Distribution Line and Substation - 39233 - City of Aztec

Physical Address View project details and contacts
City, State (County) Aztec, NM 87410   (San Juan County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Power Plant, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $3,700,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To construct a second 15KV distribution line, giving the city a back-up source of power as well as providing for future growth in Aztec in San Juan County This project will allow the City of Aztec to have a second 15KV distribution line, giving the City a back-up source of power for the City as well as providing for future growth. The electric distribution substation will be placed at the City Limits of Aztec on Navajo Dam Road next to the Ancient Trails transmission substation. As of January 3, 2023, this project is currently in the City of Aztec 2023-2027 Capital Improvement Plan (CIP). Funding for this project is allotted in the City's capital improvement plan for construction FY 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, High-Performance Structural Concrete, Concrete Finishing, Specialty Placed Concrete, Precast Structural Concrete, Precast Concrete Specialties.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Access Doors and Panels, Coiling Doors and Grilles, Windows, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Safety Specialties, Emergency Aid Specialties, Fire Protection Specialties, Exterior Specialties, Security Mirrors and Domes.
Division 11 - Equipment, Parking Control Equipment, Loading Dock Equipment, Security Equipment.
Division 13 - Special Construction, Radiation Protection, Special Instrumentation, Seismic Instrumentation.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Personal Protection Systems, Electronic Detection and Alarm, Fire Detection and Alarm, Radiation Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Grading, Earthwork Methods, Soil Treatment, Soil Stabilization.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Fuel Distribution Utilities, Electrical Utilities, Electrical Utility Transmission and Distribution, Utility Substations, Utility Transformers, High-Voltage Switchgear and Protection Devices, Medium-Voltage Utility Switchgear and Protection Devices, Communications Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors, Cranes and Hoists.
Division 46 - Water and Wastewater Equipment.
Division 48 - Electrical Power Generation, Common Work Results for Electrical Power Generation, Instrumentation and Control for Electrical Power Generation, Electrical Power Generation Equipment, Electrical Power Generation Testing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents