Reported 02/12/2021 12:00 AM
Project Title

Fenno Wellhouse Replacement

Physical Address View project details and contacts
City, State (County) Vail, CO 81657   (Eagle County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed generally includes: Replacement of the existing Upper Eagle Regional Water Authority (UERWA) Fenno Wellhouse facility, located near the intersection of Elk Spring Trail and Elk Spring Court in the Cordillera Metro District, south of the Town of Edwards. The project involves complete demolition of the existing facility, and construction of a new facility on the same site. The project involves re-connection to existing below grade raw and potable water lines, and replacement of limited portions of those existing lines, as described on the plans. The project also involves construction of a new paved driveway along a similar alignment to that of the existing gravel access

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents