Similar Projects
Worden Park-East Playground - City of Royal Oak
Renovation, Infrastructure
Conception
$300,000 est. value
Royal Oak, MI 48073

Worden Park-East Playground - City of Royal Oak
Renovation, Infrastructure
Conception
$300,000 est. value
Royal Oak, MI 48073

Concrete Shared-use Path, Curb, Gutter, Sidewalk and Ramps, Storm Drain and Pavement Markings on Woodward Avenue
Infrastructure
Design
$2,739,086 CJ est. value
Pleasant Ridge, MI 48069

Mercer Beach Improvements Phase 2
Infrastructure
Design
$400,000 CJ est. value
Walled Lake, MI 48390

2022 S.A.D. Repair Program
Infrastructure
Bidding
$500,000 CJ est. value
Beverly Hills, MI 48025

Concrete Reconstruction, Concrete Curb and Gutter, Sidewalks, Sidewalk Ramps, Culverts, Sewer, Drainage, Steel Piling, Steel Sheet Piling, Cofferdams, Guardrail Work, Signage
Demolition, New Construction, Infrastructure
Bidding
$215,153,000 CJ est. value
Oak Park, MI 48237

Hess Hathaway Animal Fencing
Infrastructure
Sub-Bidding
$50,000 CJ est. value
Waterford, MI 48327

Hess Hathaway Animal Fencing
Infrastructure
Sub-Bidding
$50,000 CJ est. value
Waterford, MI 48327

2016 Bond Project - Sashabaw Middle School Track
Post-Bid
Clarkston, MI 48346

CDBG ADA Sidewalk and Ramp Installation Project
Infrastructure
Post-Bid
$800,000 CJ est. value
Milford, MI 48381

Martin Park Splash Pad Design / Build
Results
Ferndale, MI 48220

Geary And Wanda Park Improvement Project
Renovation
Results
Ferndale, MI

The Goddard School and Annex
New Construction, Build-Out - 31,564 SF
Construction
$6,500,000 est. value
Beverly Hills, MI 48025

The Delaware
New Construction, Infrastructure
Pending Verification
$12,000,000 CJ est. value
Royal Oak, MI 48067

La Salette Multi-Family Development - The Ivy
Infrastructure, Renovation - 22,923 SF
Pending Verification
$5,000,000 CJ est. value
Berkley, MI 48072

Last Updated 08/18/2022 04:35 PM
Project Title

Crestview Park Pickleball Courts

Physical Address View project details and contacts
City, State (County) Birmingham, MI 48009   (Oakland County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $63,750 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of August 1, 2022 this project has not yet been awarded. A timeline for award has not yet been established.** Crestview Park is located at Southfield Rd and Southlawn Blvd, just South of Lincoln Avenue and North of 14 Mile Rd, on the east side of Southfield Rd. This project includes the removal of existing tennis nets and posts, crack repair and the application of new acrylic surfacing over the entire existing court surface, the supply and installation of new pickleball posts, nets, and center straps with anchors for six (6) courts, new 8' fencing with top, bottom, and mid span rail, and one 4' gate to separate three (3) northern courts from three (3) southern courts, new markings for six (6) new pickleball courts, and all related work. This work must be performed as specified accordance with the specifications contained in the Request For Proposals (RFP). Delivery Point Birmingham, MI Questions are submitted online No Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % It is anticipated the selection of a firm will be completed by August 16, 2022. An Agreement for services will be required with the selected Contractor. A copy of the Agreement is contained herein for reference. Contract services will commence upon execution of the service agreement by the City. PROJECT TIMELINE It is anticipated that this project will commence by September 6, 2022, and will be completed by September 30, 2022. A pre-project meeting will be scheduled after award to review project schedule. The Contractor will not exceed the timelines established for the completion of this project *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. $50,000- $60,000

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents