Similar Projects
Construction of a Conditioned Room at the Yellow River Water Reclamation Facility
New Construction
Bidding
Lilburn, GA 30047

Coppermine Water Reclamation Facility MBR Treatment capacity Expansion
Addition
Bidding
Hiram, GA 30141

Hightower Water Treatment Plant Expansion
Renovation
Post-Bid
Dawsonville, GA

Shoal Creek Wastewater Treatment Plant Central
Post-Bid
Griffin, GA

Interstate Centre Wastewater Treatment Facility And Las Expansion
Results
Richmond Hill, GA

Aragon 170,000 Gpd Wastewater Treatment Belt Press And Building
Results
Less than $748,665 est. value
Cedartown, GA

I-85 Water Reclamation Facility - Major Equipment and Services
Renovation
Bidding
Jefferson, GA

Water Treatment Plant Expansion Membrane Procurement
New Construction
Post-Bid
GA

Water Treatment Plant #1 Aerator Replacement
Results
Kingsland, GA 31548

Riverside Drive WTP FY2022 Basin Coatings Project
Renovation
Post-Bid
Gainesville, GA 30501

Canton Wastewater Treatment Plant Expansion to 6-MGD
Results
$63,789,100 est. value
Marietta, GA 30066

AWTP Chlorine Scrubber System
Renovation
Post-Bid
Macon, GA 31211

Water Treatment Plant - Division 1
Results
Warner Robins, GA

Drinking Water Filteration System
Renovation, Infrastructure
Post-Bid
Waynesboro, GA

Gees Mill WaterTreatment Plant Maintenance Building.
New Construction - 6,267 SF
Results
Less than $750,000 est. value
Conyers, GA 30013

Reported 04/04/2022 09:24 AM
Project Title

Scott Candler Water Treatment Plant Electrical Building No. 2 Structural Design Improvements and Distribution System Panels Installation (Multiyear Contract)

Physical Address View project details and contacts
City, State (County) Decatur, Doraville, Dunwoody, Lithonia, Stone Mountain, Tucker, GA 30360   (DeKalb County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall provide services to structurally rehabilitate the Scott Candler Water Treatment Plant (SCWTP) Electrical Building No. 2 (EB2). These repairs would require replacing damaged roof truss connections, replacing all cracked masonry blocks with new masonry blocks and reattaching portions of the precast panels.

Details

Water Treatment Plant, Renovation.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents