Similar Projects
Hydrant Fuel System Replacement
Term Contract
Design
$25,000,000 to $100,000,000 est. value
Milwaukee, WI

Above Ground Fuel Tank Storage System
Infrastructure
Post-Bid
Lodi, WI 53555

Fort Mccoy Central Fuels Repair
Term Contract
Post-Bid
Fort McCoy, WI

Installation of Radon Gas Mitigation System
Results
Milwaukee, WI 53207

Fueling System Removal
Results
Less than $258,500 est. value
Wisconsin Rapids, WI

Fuel System Relocation and Upgrade
Alteration
Post-Bid
Appleton, WI

Landfill Phase 4 Gas System
Results
$210,300 est. value
Janesville, WI

Fuel System Upgrade
Alteration
Post-Bid
Oconomowoc, WI 53066

DPW Yard Fuel Tank Replacement
Results
Greenfield, WI 53220

Hartford Municipal Airport
New Construction
Post-Bid
Madison, WI

Fuel Storage Tank Replacement
Results
Less than $230,000 est. value
Kenosha, WI 53144

XPO Logistics Tanks
Alteration
Post-Bid
Tomah, WI 54660

WBOA at Alexander Field-South Wood County Airport
Results
Wisconsin Rapids, WI 54494

Buried Fiberglass Fuel Tanks
Infrastructure
Post-Bid
Madison, WI

Aviation Fuel System Installation
Results
Baraboo, WI 53913

Last Updated 05/05/2022 05:03 AM
Project Title

Liquid Propane Backup System Upgrade

Physical Address View project details and contacts
City, State (County) Fox Lake, WI 53933   (Dodge County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In general the work consists of: the installation of one 18,000 gallon liquid propane (LP) vessel. The work will also include new liquid and vapor piping, and safety modifications to an existing 18,000 gallon LP vessel on site. The new LP vessel will be mechanically interconnected to the existing LP filling and vaporizer pump system. Site landscaping and restoration will be performed consisting of stone mulch, security fencing, and crash protection bollards

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents