Similar Projects
411 Apartments
New Construction - 383,000 SF
Conception
$10,000,000 CJ est. value
Los Angeles, CA 90012

Los Angeles Chargers Headquarters & Training Facility
New Construction, Infrastructure
Conception
El Segundo, CA 90245

AC Hotel by Marriott
New Construction
Design
Sherman Oaks, CA 91403

Warner Center Life Plan Community - Woodland Hills
New Construction - 758,835 SF
Design
$10,000,000 CJ est. value
Los Angeles, CA 91367

Planet Fitness
Renovation
Bidding
Los Angeles, CA 90081

Construction Manager Services at Risk -Student Health, Wellness and Recreation Center
Renovation
Bidding
$63,029,000 est. value
Carson, CA

Planet Fitness
Renovation - 14,423 SF
Post-Bid
Los Angeles, CA 90018

El Segundo Middle School Gymnasium Project
New Construction
Post-Bid
$14,000,000 est. value
El Segundo, CA 90245

The 1860 Los Feliz Mixed Use Development
New Construction, Build-Out
Construction
Los Angeles, CA 90000

Vistas at Glendora
New Construction - 107,980 SF
Construction
$10,000,000 CJ est. value
Glendora, CA 91740

The Bellwood
New Construction, Demolition - 241,754 SF
Pending Verification
$10,000,000 CJ est. value
Los Angeles, CA 90064

Pico Boulevard Mixed-Use
New Construction, Infrastructure
Pending Verification
Los Angeles, CA 90019

670 Mesquit Building 2
New Construction
Conception
Los Angeles, CA 90021

Apartment Tower
New Construction - 230,000 SF
Design
$10,000,000 CJ est. value
Los Angeles, CA 90028

Hollencrest Middle School Gymnasium New Construction
New Construction
Post-Bid
West Covina, CA 91791

Last Updated 06/27/2022 09:44 AM
Project Title

Park Facility HVAC Installation - PW1712 - City of Carson

Physical Address View project details and contacts
City, State (County) Carson, CA   (Los Angeles County)
Category(s) Entertainment/Recreation
Sub-Category(s) Fitness Center
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2023
Bids Due View project details and contacts
Estimated Value $2,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

esign and Construct - $750k per Gymnasium and Facility. Conceptual plans call for the construction of a fitness / recreation center; and for site work for a playground / park / athletic field. This Project is Included in the City of Carson's FY 2022 - 2023 Capital Improvement Plan (CIP). As of June 24, 2022, information regarding a design team and a general contractor is not available. Funding is anticipated from FY 2022 to FY 2025.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Fitness Center, New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Specialty Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers.
Division 11 - Equipment, Athletic Equipment, Exercise Equipment.
Division 12 - Furnishings, Rugs and Mats.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents