Reported | 06/03/2022 12:00 AM |
Project Title | Sourdough Campground Bridge |
Physical Address | View project details and contacts |
City, State (County) | Gakona, AK 99586 (Valdez-Cordova County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | $300,000 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Demolition, site work, paving and new construction of a bridge / tunnel in Gakona, Alaska. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel. General Questions - Contact our office at wfl.contracts@dot.gov or at 360-619-7520. Sol.no- 69056722B000012 Sourdough Campground Road over Sourdough Creek Sourdough Campground Bridge is a single span, two lane bridge. The bridge was constructed in its current location in 1991, but the Glulam girders are from a previous bridge that was built in 1952. The design plans are on file at the NOC. The span length for the bridge is 48'-10" and the out to out width is 26'-0". The superstructure consists of four glulam girders that are 35 3/4 " deep. The two interior girdersare 13" wide and the two exterior girders are 11" wide. The girder spacing is 6'-8". There are timber diaphragms between each girder located at the one third span length locations. The deck consists of 6 -3/4 " thick glulam deck panels. For the wearing surface, there are four sets of three 3x12" longitudinal running planks. There is a timber curb and railing system. The substructure consists of a 2'-0" thick concrete cap beam that is supported by four 2'-0" by 2'-0" concrete columns that tie into a 1'-6" thick concrete spread footing that is 7'-0" wide. Goals for Minority Participation for Each Trade: 6.8% Goals for Female Participation for Each Trade: 6.9% |
||||||||||||||||||||
Details | Bridge, New Construction.
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |