Similar Projects
Asphalt Maintenance-Districtwide Maintenance
Infrastructure
Bidding
$500,000 est. value

Mechanical Sweeping
Post-Bid
$190,047 est. value

Annual Asphalt Paving and Asphalt Pavement Repairs
Term Contract
Post-Bid
Marianna, FL

Old Cottondale Road - Roadway Improvement and Water System Improvements
Results
Marianna, FL 32447

Old Cottondale Road - Roadway Improvement and Water System Improvements
Results
Marianna, FL 32447

Annual Asphalt Paving & Asphalt Pavement Repairs
Post-Bid
Marianna, FL

Florida Caverns State Park - Campground Water Plant Replacement
Results
Marianna, FL 32446

Patching and Resurfacing Program
Post-Bid
FL

Longview Road Reconstruction Project
Results
$579,111 est. value
FL 32446

District 2 Dirt Road Asphalt Paving
Post-Bid
FL

Milling and Resurfacing
Results
$4,842,893 est. value
FL

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Mandarin Road Loop Water Main Connection
Results
Less than $356,435 est. value
Jacksonville, FL 32223

District 2 (4177) Chip Seal with Asphalt Option
Infrastructure
Post-Bid
Marianna, FL

CR 277 (Piano Road) from CR 162 to SR 77
Results
FL

Last Updated 07/25/2022 02:06 PM
Project Title

GLAD Phase I - Roadway and Infrastructure

Physical Address View project details and contacts
City, State (County) Marianna, FL 32446   (Jackson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

For the following generally described Project scope: Construction of +-700 LF of new asphalt roadway with concrete curb and gutter, new driveway connection (consisting of 3 - 12' lanes) to SR 71, 75' diameter stabilized turnaround area, asphalt right turn lane on SR 71, extension of 10" water main and associated appurtenances, extension of 8" gravity sewer man and associated sewer manholes, storm inlets, and storm pipe. Questions shall be emailed to Marti Vickery at martivickery@melvineng.com. The deadline for questions is Friday, July 15, 2022 by 4:00 PM CT. The Owner reserves the right to waive any informalities or to reject any or all bids. Each Bidder must deposit with his/her bid, security in the amount, form and subject to the conditions provided in the Information for Bidders. No bids may be withdrawn for a period of sixty days after the scheduled closing time for receipt of bids. Bidders are encouraged to solicit Minority and Service-Disabled Veteran Business Enterprise participation and provide documentation of such solicitation.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents