Similar Projects
Posey Solar Project
New Construction, Infrastructure
Design
$15,000,000 CJ est. value
Mount Vernon, IN 47620

Posey Solar Project
New Construction, Infrastructure
Design
$15,000,000 CJ est. value
Mount Vernon, IN 47620

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Community Crossing Grant 2022 - Overlay on Existing Black Top
Infrastructure
Post-Bid
$228,000 est. value
Mount Vernon, IN

Street Improvements
Infrastructure
Post-Bid
$150,000 est. value
Mount Vernon, IN

Asphalt Paving
Infrastructure
Results
Mount Vernon, IN

I-70 Design-Build Added Travel Lanes and Pavement Replacement from SR-1 to IN/OH State Line
Infrastructure
Results

HMA Overlay, Preventive Maintenance - SR 69
Infrastructure
Design
$1,340,000 CJ est. value
Mount Vernon, IN 47620

Keck Water Tower
Renovation, Infrastructure
Post-Bid
$172,609 CJ est. value
Mount Vernon, IN 47620

Street Improvements
Infrastructure
Results
Mount Vernon, IN 47620

Ohio River Bank Stabilization Project
Infrastructure
Post-Bid
$700,000 CJ est. value
Mount Vernon, IN 47620

Asphalt Resurface and Auxiliary Lanes
Infrastructure
Results
$4,001,028 CJ est. value
New Harmony, IN 47631

Orphan Wells - Posey, Gibson, Vanderburgh Counties
Infrastructure
Results
$79,430 CJ est. value
Mount Vernon, IN 47620

Last Updated 03/01/2023 05:03 PM
Project Title

Street Improvements

Physical Address View project details and contacts
City, State (County) Mount Vernon, IN 47620   (Posey County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $1,200,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

ITEM # 1 ASPHALT PAVING, AS FOLLOWS: A. COUNTRY CLUB RD. HWY 62 TO WESTERN HILLS DR QTY. UNIT MOBILIZATION INCLUDES TRAFFIC CONTROL 1 EACH MILLING MILL 1.5" DEPTH & CLEANING 8,627 SYD PATCHING 4.0" HMA 25.0 mm BASE 86 TON TACK FURNISH & APPLY 603 GAL HMA SURFACE 1.5" HMA 9.5 mm SURFACE 734 TON STOP BARS WHITE PAINT PAVEMENT MARKING - 24" WIDE 2 EACH B. HAWTHORNE DR. SMITH RD. TO PARK RIDGE DR. QTY. UNIT MOBILIZATION INCLUDES TRAFFIC CONTROL 1 EACH MILLING MILL 1.5" DEPTH & CLEANING 3,285 SYD PATCHING 4.0" HMA 25.0 mm BASE 32 TON TACK FURNISH & APPLY 230 GAL HMA SURFACE 1.5" HMA 9.5 mm SURFACE 280 TON STOP BARS WHITE PAINT PAVEMENT MARKING - 24" WIDE 2 EACH C. EAST 5TH ST. MAIN ST. TO TILE FACTORY RD. QTY. UNIT MOBILIZATION INCLUDES TRAFFIC CONTROL 1 EACH MILLING MILL 1.5" DEPTH & CLEANING 12,637 SYD PATCHING 4.0" HMA 25.0 mm BASE 126 TON TACK FURNISH & APPLY 885 GAL HMA SURFACE 1.5" HMA 9.5 mm SURFACE 1,075 TON STOP BARS WHITE PAINT PAVEMENT MARKING - 24" WIDE 10 EACH D. EAST WATER ST. CANAL ST. TO LOCUST ST. QTY. UNIT MOBILIZATION INCLUDES TRAFFIC CONTROL 1 EACH MILLING MILL 1.5" DEPTH & CLEANING 1,349 SYD PATCHING 4.0" HMA 25.0 mm BASE 13 TON TACK FURNISH & APPLY 95 GAL HMA SURFACE 1.5" DEPTH, 9.5 mm 115 TON E. HARRIETT ST. EAST 10TH ST. TO DEAD END QTY. UNIT MOBILIZATION INCLUDES TRAFFIC CONTROL 1 EACH MILLING MILL 1.5" DEPTH & CLEANING 2,471 SYD PATCHING 4.0" HMA 25.0 mm BASE 24 TON TACK FURNISH & APPLY 173 GAL HMA SURFACE 1.5" DEPTH 9.5 mm 211 TON STOP BARS WHITE PAINT PAVEMENT MARKING - 24" WIDE 1 EACH F. MILL ST. WEST 4TH ST. TO DEAD END QTY. UNIT MOBILIZATION INCLUDES TRAFFIC CONTROL 1 EACH MILLING MILL 1.5" DEPTH & CLEANING 8,096 SYD PATCHING 4.0" HMA 25.0 mm BASE 54 TON TACK FURNISH & APPLY 565 GAL HMA SURFACE 1.5" HMA 9.5 mm SURFACE 686 TON STOP BARS WHITE PAINT PAVEMENT MARKING - 24" WIDE 5 EACH G. MUNCHOFF ST. WEST 4TH ST. TO WEST 8TH ST. QTY. UNIT MOBILIZATION INCLUDES TRAFFIC CONTROL 1 EACH MILLING MILL 1.5" DEPTH & CLEANING 4,172 SYD PATCHING 4.0" HMA 25.0 mm BASE 41 TON TACK FURNISH & APPLY 292 GAL HMA SURFACE 1.5" HMA 9.5 mm SURFACE 355 TON STOP BARS WHITE PAINT PAVEMENT MARKING - 24" WIDE 2 EACH H. WEST 3RD ST. PARKE ST. TO MAIN ST. QTY. UNIT MOBILIZATION INCLUDES TRAFFIC CONTROL 1 EACH MILLING MILL 1.5" DEPTH & CLEANING 14,837 SYD PATCHING 4.0" HMA 25.0 mm BASE 148 TON TACK FURNISH & APPLY 1,039 GAL HMA SURFACE 1.5" HMA 9.5 mm SURFACE 1,262 TON STOP BARS WHITE PAINT PAVEMENT MARKING - 24" WIDE 8 EACH RR CROSSING THERMO PAVEMENT MARKINGS 2 EACH (INCLUDES 3 STOP BARS, 2 R's & X) I. WOOD ST. SHORT SYCAMORE ST. TO EAST 6TH ST. QTY. UNIT MOBILIZATION INCLUDES TRAFFIC CONTROL 1 EACH MILLING MILL 1.5" DEPTH & CLEANING 6,422 SYD PATCHING 4.0" HMA 25.0 mm BASE 64 TON TACK FURNISH & APPLY 450 GAL HMA SURFACE 1.5" HMA 9.5 mm SURFACE 546 TON STOP BARS WHITE PAINT PAVEMENT MARKING - 24" WIDE 11 EACH SUMMARY OF QUANTITIES QTY UNIT MOBILIZATION & TRAFFIC CONTROL 9 EACH MILLING-FULL WIDTH & CLEANING 61,896 SY HMA PATCHING - 4" 588 TON TACK-FURNISH & APPLY 4,332 GAL HMA SURFACE - 1.5" 5,264 TON STOP BARS-PAVEMENT MARKING - 24" WIDE 41 EACH RR CROSSING-THERMO PAVEMENT MARKINGS 2 EACH (INCLUDES 3 STOP BARS, 2 R's & X) The bids shall be submitted on forms prescribed by the Indiana State Board of Accounts and bidder shall furnish bond, certified check or cashier's check, in the amount of fi ve (5%) percent of their total bid, to guarantee that they will enter a contract and/or furnish performance bond in accordance with their bids and specifications. No bid shall be opened or accepted if delivered after 11 o'clock a.m., Central Standard Time on the 22ND of February, 2023. The City of Mount Vernon, Posey County, Indiana, reserves the right to reject any and all bids.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents