Similar Projects
Lake Pump 2 Repair or Replacement - Cliff Drive Intake Station
Infrastructure
Bidding
$80,000 est. value
Branson, MO 65616

Geothermal Wellfield #4
Infrastructure
Bidding
$2,215,000 est. value
Rolla, MO

Electrical Submersible Dewatering Pumps
Post-Bid
Saint Louis, MO

Highway Department Maintenance Facility - Phase 2
Post-Bid
Carthage, MO

Missouri Bluffs Park Well
Alteration
Results
Lake Saint Louis, MO 63367

Lime Slurry Pumps
Infrastructure
Results
Festus, MO

Well 9 Plugging Project
Infrastructure
Bidding
$90,000 est. value
Defiance, MO 63341

1/2 Hp Cast Iron Pump
Term Contract
Post-Bid
Saint Louis, MO

Plugging of Well 10, Well 11, and Voss Well
Infrastructure
Results
Sullivan, MO

Neptune-Abaque Peristaltic Industrial Hose Pump Unit Model HDN25
Infrastructure
Post-Bid
Springfield, MO

Submersible Pump and Motor for the WWTP East Well
Infrastructure
Results
Lebanon, MO

Water Supply Improvements
Infrastructure
Post-Bid
Carterville, MO

Design-Build Platform for Pump Disconnects
Infrastructure
Results
Saint Peters, MO

Well Pump Replacement, Maintenance and Repair
Infrastructure
Post-Bid
Springfield, MO

Fire Pump Replacement and Alarm Device Upgrade
Infrastructure
Results
Saint Joseph, MO

Last Updated 07/18/2022 05:55 AM
Project Title

Judy School Road Well Improvements

Physical Address View project details and contacts
City, State (County) Columbia, MO 65202   (Boone County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $350,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of constructing the following improvements: Section 1: A Unit Price contract for construction of an approximate 1,300-feet deep-rock municipal water well. The well will be constructed at the location of a previously completed test well. The work includes installation of a deep-set vertical turbine well pump. Section 2: A Lump Sum contract for construction of a well house building along with installation of piping, equipment and site work for a new municipal water supply well. Section 3: A Unit Price contract for construction of approximately 203 LF 16" CL 52 DIP, 161 LF of 12" CL 52 DIP, 422 LF 12" CL 235 C900 PVC, 80 LF 12" CL 235 C900 RJ PVC ,150 LF of 12" Class 235 FPVC and 125 LF 4" Class 200 PVC water mains. The work includes a 50 LF 24" bored steel casing installation under State Hwy Z, 50 LF 20" bored steel casing under Judy School Road, 100 LF 16" FPVC HDD installation under a drainage ditch, valves, flushing assemblies, connection details, fittings, connections to existing water mains and other appurtenances.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents