Similar Projects
Soccer Complex to Coolidge Road - City of East Lansing
Infrastructure
Conception
$600,000 est. value
East Lansing, MI

Parking Lot Resurfacing and Entry Drives / East Lansing Soccer Complex
Infrastructure
Conception
$325,000 CJ est. value
East Lansing, MI 48823

Dye Reservoir Vegetation Replacement
Infrastructure
Design
$2,000,000 CJ est. value
Lansing, MI 48933

City View Lansing Apartments
New Construction, Infrastructure - 3,500 SF
Design
$25,000,000 CJ est. value
Lansing, MI 48933

Rehabilitation of Steam Manholes MH905 and MH910
Infrastructure
Bidding
$300,000 CJ est. value
Lansing, MI 48933

Hot Mix Asphalt Cold Milling and Resurfacing, Concrete Curb, Gutter and Sidewalks and Pavement Markings on Putnam Street
Infrastructure
Bidding
$1,096,000 CJ est. value
Williamston, MI 48895

Gardner Magnet School BP #2
Renovation
Sub-Bidding
Lansing, MI 48911

Underground Wire and Transformer Removal and Relocation Services
Infrastructure
Post-Bid
$80,000 CJ est. value
Mason, MI 48854

Lake Lansing Park South Improvements
Infrastructure, Renovation
Post-Bid
$200,000 CJ est. value
Meridian charter Township, MI 48840

Elementary Outdoor Learning Centers & High School Athletic Improvements
Renovation
Results
East Lansing, MI

Elementary Outdoor Learning Centers & High School Athletic Improvements
Renovation
Results
East Lansing, MI

Okemos Public Schools 2022 Bond Program Bid Package No. 1 2023 Summer Renovations
Renovation
Construction
$4,266,025 CJ est. value
Meridian charter Township, MI 48864

Okemos Public Schools 2022 Bond Program Bid Package No. 1 2023 Summer Renovations
Renovation
Construction
$4,266,025 CJ est. value
Meridian charter Township, MI 48864

Neogen Shiawassee Street Manufacturing Plant
New Construction, Infrastructure - 175,000 SF
Pending Verification
$70,000,000 CJ est. value
Lansing, MI 48912

Meridian Company Industrial Building
New Construction, Infrastructure - 31,355 SF
Pending Verification
$16,000,000 CJ est. value
East Lansing, MI 48823

Last Updated 09/27/2023 02:09 PM
Project Title

Lansing School District Phase II - Gardner IMS-BP2 2023 Facility Improvements - Bid Pack II

Physical Address View project details and contacts
City, State (County) Lansing, MI 48911   (Ingham County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Middle/Senior High School, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Lansing School District Energy Efficiency Project Bid Pack 2 A five percent (5%) Bid Bond shall accompany each bid. The successful bidder will be required to provide a Performance Bond and Labor and Material Bonds, and certificates of Liability and Worker's Compensation Insurance. The Lansing Schools Board of Education reserves the right to accept or reject any or all bids. All questions (RFI's) must be in writing and should be directed to Jon Laing, Lansing School District Chief Financial Officer at: projects@lansingschools.net, and James Styka, SitelogIQ Project Manager at: james.styka@sitelogiq.com no later than 12:00 PM on Thursday, July 20, 2023. Addendums will be posted on the Lansing School District's website and SIGMA as they are issued. **As August 16 ,2023 the project has not been awarded and a timeline for the award is not yet established.**

Details

91,798 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents