Similar Projects
Trail Lakes Apartments
New Construction
Design
$6,000,000 est. value
Fort Worth, TX 76133

2018 Bond Year 3, Contract 9
Bidding
Fort Worth, TX 76112

RM2871 - Resurface Roadway
Bidding
$1,021,821 est. value
TX

Audi of Fort Worth
New Construction
Sub-Bidding
Fort Worth, TX 76132

1400-1500 Blks Byrd Drive, Street Improvements
Post-Bid
Less than $256,970 est. value
Fort Worth, TX 76114

CIP Improvements Hackamore Street – Sewer, Water & Paving Replacement
Post-Bid
$600,000 est. value
White Settlement, TX 76108

Southern Region Disaster Recovery Support BPA
Results

Parker Henderson Road from Mansfield Highway (BUS.287) to Kellis Street
Results
Fort Worth, TX 76102

2020 Street Mill, Overlay at Various Locations
Post-Bid
Bedford, TX 76021

Rehabilitation of Existing Road
Results
Less than $339,106 est. value
TX

Concrete and Asphalt Repair Services
Term Contract
Post-Bid
Arlington, TX 76019

2020 Brick Pavement Rehabilitation at Various Locations
Results
Fort Worth, TX 76102

FY2019 CIP Improvements Tumbleweed Trail Sewer, Water and Paving Replacement
Post-Bid
Less than $1,800,000 est. value
White Settlement, TX 76108

2020 Concrete Restoration Contract 2 at Various Locations
Results
Fort Worth, TX 76102

Asa Low Intermediate School Access Driveway
Post-Bid
$400,000 to $500,000 est. value
Mansfield, TX 76063

Last Updated 10/02/2020 01:00 PM
Project Title

Pleasant Run Road Water, Sewer, Paving, and Drainage Improvements

Physical Address View project details and contacts
City, State (County) Colleyville, TX 76034   (Tarrant County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,700,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes improvements to the existing water and sewer lines along Pleasant Run Road from John McCain Road to the north city limit line. The water line construction will also continue into Southlake with the installation of a vault for a future water system interconnection. The water line will be constructed by methods of open cut and horizontal directional drilling. The project also includes a full depth asphalt rehabilitation for Pleasant Run Road and the addition of a concrete ribbon curb. A concrete hike anbd bike trail is to be constructed in the east parkway. Existing stom drain infrastructure including driveway culverts and roadway culverts will be replaced and/or upsized as part of this project.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents