Similar Projects
Civic Campus HVAC System Upgrade Project - Rebid
Renovation
Design
$80,000 CJ est. value
Pacific, WA 98047

Building 1074 Air Handling Unit Replacement
Renovation
Sub-Bidding
$500,000 CJ est. value
Keyport, WA 98345

Central Kitsap Fire and Rescue Station 57 - Part 2
New Construction, Infrastructure
Sub-Bidding
$7,300,000 CJ est. value
Bremerton, WA 98312

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

North Franklin School District Connell High School HVAC Replacements
Alteration
Results
Connell, Pasco, WA 99326

51st Circle HVAC Purchase and Installation
Alteration
Results
Vancouver, WA 98661

HVAC Replacement Rooftop Heat Pump and A/C Units
Renovation
Construction
$132,868 CJ est. value
Renton, WA 98057

South Shore K-8 Chiller Replacement
Renovation
Construction
$225,350 CJ est. value
Seattle, WA 98118

Chiller 6 Repairs
Renovation
Sub-Bidding
$450,000 CJ est. value
Seattle, WA 98164

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Clallam County Courthouse VAV Replacement Project
Alteration
Results
$330,000 est. value
Port Angeles, WA 98362

HVAC Maintenance and On-Call Repair Services
Term Contract
Sub-Bidding
Shoreline, WA 98133

City Hall HVAC Monitoring
Alteration
Post-Bid
$28,840 est. value
Sammamish, WA 98075

Headquarters Diesel Exhaust Removal System
Alteration
Results
$92,500 est. value
Belfair, WA 98528

Last Updated 10/06/2022 03:03 AM
Project Title

Courthouse HVAC Renovation

Physical Address View project details and contacts
City, State (County) Dayton, WA 99328   (Columbia County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Est. Completion Date: May 1, 2023. This project is for the replacement of the existing water source heat pump system including the cooling tower, boilers, and water source heat pumps (WSHP) inside the courthouse. Ductwork and piping modifications will be made to accommodate connection to the new WSHPs, but most of the existing ductwork and piping will be reused. Space is limited in some WSHP locations and access to the upper floor units is via a narrow staircase. The contractor will be required to coordinate the work with the Owner to minimize the disturbance of workers in some areas. Electrical components of this project are to be design build by the contractor. Bidding contractors shall bid a complete and functioning system.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents