Similar Projects
Intersection Improvements - SC 183 at Jameson Road
Infrastructure
Conception
$2,000,000 CJ est. value
Pickens, SC 29671

Intersection Improvement SC 135 (Dacusville Hwy)/ S-95 (Jameson Rd)
Infrastructure
Design
$2,100,000 CJ est. value
Easley, SC 29640

Williamson Road/Old Stadium Road Realignment
Infrastructure
Bidding
$3,000,000 CJ est. value
Clemson, SC 29631

Reeves Football Complex, Studio/PAW Journey, Renovations
Renovation, Infrastructure - 151,643 SF
Bidding
$1,200,000 CJ est. value
Clemson, SC 29631

Drilling Services
Infrastructure
Post-Bid
Clemson, SC

RFQ Construction Manager at Risk - Tillman Hall Auditorium Renovation
New Construction, Renovation, Infrastructure
Post-Bid
$9,000,000 CJ est. value
Clemson, SC 29631

Church Street Waterline Replacement
Infrastructure
Results
$1,451,913 CJ est. value
Central, SC 29630

Navy Base Intermodal Facility Advanced Work Package project
Demolition, Infrastructure
Results

Jiffy Lube & Caliber Collision
New Construction - 20,898 SF
Construction
$2,400,000 est. value
Easley, SC 29640

Nettles Park Expansion - City of Clemson
Addition, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Clemson, SC 29631

2023 Road Reclamation Project
Infrastructure
Bidding
$2,000,000 CJ est. value
Pickens, SC 29671

Discount Tire
New Construction - 8,515 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Easley, SC 29640

Concrete Foundation - Table Rock State Park
Alteration
Results
$50,000 est. value
Pickens, SC 29671

Six Mile Pavilion
New Construction, Infrastructure
Post-Bid
$250,000 CJ est. value
Six Mile, SC 29682

CTC Preservation Fish Trap Road
Infrastructure
Results
$1,329,203 CJ est. value
Easley, SC 29640

Last Updated 10/10/2022 10:02 AM
Project Title

Strickland Brother Oil Change / Easley

Physical Address View project details and contacts
City, State (County) Easley, SC 29640   (Pickens County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Gas Station, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

*The owner requests that all subcontractor / supplier inquiries be directed to the GC Bidder.

Details

1 Story Above Grade, 1,300 SF.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Metal Doors and Frames, Panel Doors.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment.
Division 22 - Plumbing, Facility Water Distribution, Facility Storm Drainage.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents