Similar Projects
Santa Rita Water Reclamation Facility (SRWRF) Treatment Complex Basement Leak Mitigation
Infrastructure
Bidding
Durango, CO 81301

Avon WWTF Lab Improvements
New Construction
Bidding
Vail, CO

2.46 MGD WWTF Nutrient Improvements Finishes
Post-Bid
Snowmass Village, CO 81615

Total Organic Carbon (TOC) Analyzer for Water Reclamation Facility
Post-Bid
Pueblo, CO

CMGC Chemical Phosphorus & UV Disinfection Project
Results
Englewood, CO 80110

Headworks and Odor Control Project
Results
Less than $6,000,000 est. value
Superior, CO 80027

Construction Manager at Risk Wastewater Treatment Facility Improvements
Construction
Platteville, CO 80651

Lazy Glen Wastewater Treatment Facility
Renovation
Bidding
CO

Sterling Wastewater System Improvements Bid Package 100 Headworks and Influent Pump Station
Post-Bid
$5,000,000 to $7,000,000 est. value
Sterling, CO

2020 Trenchless Sewer Main Replacement
Results
Less than $1,164,404 est. value
Arvada, CO 80002

Headworks Building
Renovation
Bidding
Rangely, CO

Wastewater Treatment Plant Equipment
Post-Bid
Johnstown, CO

Non-Potable Water Reuse System
Results
Pueblo, CO 81007

Design-Builder Clear Springs Ranch Resource Recovery Facility Biogas Utilization
New Construction
Bidding
CO

Bid Package 300 Sterling Wastewater System Improvements
Post-Bid
$15,000,000 to $20,000,000 est. value
Sterling, CO 80751

Last Updated 09/24/2021 02:40 PM
Project Title

WBWTP Maintenance Project

Physical Address View project details and contacts
City, State (County) Thornton, CO   (Adams County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: 1. Installation of cementitious crystalline concrete waterproofing to the perimeter walls and top slab of the CT Chamber/Clearwell Structure and to repair cracks, joints, and defects in the concrete using cementitious crystalline repair products. 2. Replacement of one (1) air compressor with new variable speed rotary air compressor. 3. Surface preparation and recoating of the normally submerged carbon steel elements of the four existing solids contact clarifiers, including but not limited to, the rake mechanism, center column, reaction well, draft tube, impeller, drive cage, support structure, and influent pipe. 4. Replacement of materials in the clearwell due to corrosion and pickle and passivation. Installation of a blower system for the headspace in the clearwell. 5. New piping and appurtenances (valves, actuators, flower meter) for the clarifier sludge blowdown system. There are four (4) clarifiers.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents