Similar Projects
Reclaimed Water Piping Improvements Project
Infrastructure
Bidding
$4,000,000 est. value
Clearwater, FL

Equipment Calibration, Repair, and Replacement - Utilities
Post-Bid
FL

Structure Tops R and R North County Sugar Bear Trail
Infrastructure
Post-Bid
$876,892 est. value
Clearwater, FL

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Utility Rehabilitation and Construction Services
Term Contract
Results
Tarpon Springs, FL 34688

Force Main 8 Replacement
Infrastructure
Post-Bid
Saint Pete Beach, FL 33706

Construction of Harbor Palms Infrastructure Project Phase 2
Results
Oldsmar, FL

City Of Clearwater Ro1 Bypass Project June 2021
Renovation, Alteration
Post-Bid
$50,000 est. value
Clearwater, FL 33755

Coating of 36 Inch Wtm; Restoration of Potable/Reclaimed Water Mains
Results
Saint Petersburg, FL

Mandarin Road Loop Water Main Connection
Results
Less than $356,435 est. value
Jacksonville, FL 32223

Advanced Metering Infrastructure
Results
FL

Downtown Water Main Replacement Phase III
Results
Saint Petersburg, FL

Utility Locate Services
Infrastructure
Results
Clearwater, FL

County Road 95 Force Main Replacement and Relocation
Infrastructure
Results
$814,985 est. value
Clearwater, FL

Philippe Pointe Pedestrian Bridge Water Main Project
Infrastructure
Results
$565,000 est. value
Safety Harbor, FL

Reported 03/11/2022 12:00 AM
Project Title

Design Build Services, Northeast Water Reclamation Facility Prestressed Concrete Cylinder Pipe (PCCP) Replacement Phase 4

Physical Address View project details and contacts
City, State (County) Saint Petersburg, FL 33702   (Pinellas County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Design-Build. Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project entails installation of a new 36" reclaimed water main (RCW) of total approximate length of 7,900 LF. The project extends easterly along 77th Ave. North from 16th St. North to 1st St. North, and southerly along 1st St. North to a connection point near 74th Ave NE. in St. Petersburg, FL in Pinellas County

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents