Last Updated 11/28/2018 06:43 PM
Project Title

Blackwell Road at Autumn Ridge Parkway Safety and Operational Improvements

Physical Address View project details and contacts
City, State (County) GA   (Cobb County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description The project will consist of improving sight distance and removing the 4-way stop at the intersection of Blackwell Road and Autumn Ridge Parkway creating a 2-way stop. Construction will also add left turn lanes in both directions on Blackwell Road to Autumn Ridge Parkway along with a 5-foot sidewalk and curb and gutter. Cobb County Water System work is included on this project.
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents