Similar Projects
FLCI HU 7 Bathroom Repairs
Renovation
Conception
$350,600 est. value
Fox Lake, WI 53933

Replace Roof - Kenosha County Detention Center - Facilities -17 - Kenosha County
Renovation
Conception
$950,000 CJ est. value
Kenosha, WI 53144

Jail Kitchen & Dish Washing Room
Renovation
Design
Green Bay, WI 54311

Attorney Visitation Booth Renovation
Renovation
Design
$200,000 CJ est. value
Appleton, WI 54911

Cell Hall Railing Improvements
Renovation
Bidding
$150,000 CJ est. value
Waupun, WI 53963

Boiler Repairs
Renovation
Bidding
$115,000 CJ est. value
Black River Falls, WI 54615

Rock County Jail / LES - BP#1 Footing and Foundation
Renovation
Post-Bid
$25,000 est. value
Janesville, WI 53545

LES / Jail All Work
Renovation
Post-Bid
$100,000 est. value
Janesville, WI 53545

Jail Remodel
Renovation
Results
Neillsville, WI 54456

Trempealeau County Justice Center - Bid Package 2
New Construction
Results
Whitehall, WI 54773

New Health Services Unit, Stanley Correctional Institution
Addition
Pending Verification
$8,213,000 CJ est. value
Stanley, WI 54768

Replace Hot Water System - Facilities-21 - Kenosha County - Purchasing
Renovation
Conception
$300,000 CJ est. value
Kenosha, WI 53144

Fox Lake Correctional Institution HSU-Food Service Roof Replacement - State of Wisconsin - Department of Corrections
Renovation
Design
$1,615,200 est. value
Fox Lake, WI

Dane County Jail Consolidation - South Tower Addition
Addition, Demolition, New Construction, Renovation, Infrastructure
Post-Bid
$166,000,000 CJ est. value
Madison, WI 53715

Fire Alarm Upgrade
Alteration
Results
$2,375,500 est. value
Sturtevant, WI 53177

Last Updated 04/24/2023 11:34 AM
Project Title

Taycheedah Correctional Institution - Steam Line Replacement - GPC

Physical Address View project details and contacts
City, State (County) Fond du Lac, WI 54937   (Fond du Lac County)
Category(s) Government/Public
Sub-Category(s) Prison/Jail
Contracting Method Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $3,107,787 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

All potential bidders must be certified by DOA prior to submitting bids on state construction projects over $50,000. All bids received from contractors who are not certified will be rejected. Contractor certification applications and instructions for completing the form may be obtained from the DOA Website DFD Contractor Certification page This project is being let using the single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders n general, the work consists of the upgrading steam and condensate piping along with supports within approximately 1425 lineal feet of existing utility tunnel. Installation of approximately 600 lineal feet of direct buried steam and condensate conduits. All area shall be restrored when work is complete. Base Bids will be received as a single lump sum bid for: 4) Mechanical (Heating, Ventilating, Air12 Conditioning); and 5) Electrical Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted he 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements. For Site walk through - Contractors are required to contract Robert Otremba no later than seven (7) days prior to the pre-bid date. Items of note about the pre-bid walk through: 1. Contractors are to meet at the TCI Gate House lobby at 9:00 am on February 1, 2023. Contractors will be screened in the lobby. 2. Contractors will be escorted thru out project limits by TCI personal. 3. Only one (1) representative per contractor will be allowed for the pre-bid Replace Steam Distribution Pipes which consist of both steam supply and condensate return lines which serve bldg. 1102-Addams Hall at 210/Lf., Homestead (bldg.1302-Old Gov. House, bldg. 1410-Chapel & bldg. 2409) at 420/Lf. And bldg. 1107-AB (Abrahamson Housing Unit) from steam pit to bldg. at 150/Lf. Remove degraded steam distribution pipes and box conduit, replace with direct buried steam pipe. total linear ft. approx. 780'. the pre-bid walk through previously scheduled for February 1, 2023 at 9:00 am has been rescheduled to February 6, 2023 at 9:00 am. Sealed bids will be received as PDF scanned file of all required bid documents, including bid and bid bond forms with original wet signatures or properly transmitted electronic signatures (only PDF files will be accepted) emailed to doadfdmbidsubmission@wisconsin.gov (this is the preferred method); US Mail or Third-party delivery (UPS, Fedex, or DHL) to State of Wisconsin, Administration Building, 7th Floor, 101 East Wilson Street, Madison, Wisconsin 53703; or Hand delivery to the drop box labeled SEALED BIDS ONLY in front of the State of Wisconsin Administration Building located at 101 East Wilson Street, Madison, Wisconsin 42 53703.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications, Metal Specialties, Detention Enclosures.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Access Doors and Panels, Special Function Doors, Security Doors and Frames, Security Gates, Detention Doors and Frames, Windows, Special Function Windows, Detention Windows, Detention Window Screens, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating, Special Coatings, Concrete and Masonry Coatings.
Division 10 - Specialties, Signage, Lockers, Flagpoles, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Detention Equipment, Detention Pass-Through Doors, Detention Gun Lockers, Foodservice Equipment.
Division 12 - Furnishings, Detention Furniture.
Division 13 - Special Construction, Special Purpose Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Detention Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems, Public Information Systems, Distributed Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents