Similar Projects
Extra Hand Storage
New Construction - 144,836 SF
Conception
$10,000,000 CJ est. value
Miami, FL

Cypress Lake United Methodist Church Multipurpose Facility
New Construction, Addition - 18,262 SF
Conception
$500,000 to $1,000,000 CJ est. value
Fort Myers, FL

Sentry Self Storage and Retail
New Construction - 127,653 SF
Design
$10,000,000 CJ est. value
Boca Raton, FL 33487

Safe & Secure Self Storage
New Construction - 220,100 SF
Design
$10,000,000 CJ est. value
Oakland Park, FL 33311

East Water Treatment Plant Chemical Storage Facilities - Phase II
New Construction
Bidding
$3,604,000 est. value
Plantation, FL 33317

FPL Indian River Service Center - Phase IV, V, VI
New Construction - 44,616 SF
Bidding
$5,000,000 to $10,000,000 CJ est. value
Vero Beach, FL 32966

Davie Storage
New Construction - 79,815 SF
Sub-Bidding
$5,000,000 to $10,000,000 CJ est. value
Davie, FL 33024

Village Grande Climate-Controlled Storage
New Construction - 100,032 SF
Sub-Bidding
Altamonte Springs, FL 32714

Dickens Annex Sheds
Post-Bid
Wewahitchka, FL 32465

Public Storage #PS 25503
Addition - 58,484 SF
Post-Bid
$10,000,000 CJ est. value
Brandon, FL 33511

Renovations- Truck Shed T and D Building 400
Renovation
Results
Ocala, FL 34471

Levy Welding Material Storage
Results
Chiefland, FL 32626

Extra Space Self Storage
New Construction - 111,686 SF
Construction
$10,389,865 est. value
West Palm Beach, FL 33401

Crews Commerce Center Industrial Park - Phase II
New Construction - 1,290,240 SF
Construction
$27,900,000 est. value
Orlando, FL 32824

Bayou Grande Storage
New Construction - 18,400 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Pensacola, FL 32507

Reported 08/04/2021 08:23 AM
Project Title

Dollar Tree Distribution Center

Physical Address View project details and contacts
City, State (County) Ocala, FL 34473   (Marion County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method
Project Status Building in Operation as of first quarter 2021
Bids Due View project details and contacts
Estimated Value $200,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Warehouse/Storage, 1,700,000 SF New Construction, 198 Acres.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware, Door Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Parking Control Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents