Similar Projects
Last Updated | 08/14/2023 08:05 AM |
Project Title | Beaver Avenue Waterline Replacement |
Physical Address | View project details and contacts |
City, State (County) | Niles, OH 44446 (Trumbull County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected September 2023 |
Bids Due | View project details and contacts |
Estimated Value | $284,175 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work to be performed as part of this Contract consists of installation of 1160 LF of 6" waterline and appurtenances. Project is located on Beaver Avenue between Robbins Avenue and Pearl Street. Domestic Steel use requirements as specified in Section 153.011 of the Revised Code apply to this project. Copies of Section 153.011 of the Revised Code can be obtained from any of the offices of the Department of Administrative Services. Each bidder shall be required to complete and file with his bid the enclosed Proposal Guaranty and Performance/Payment Bond Form (Section 153.571 of the Ohio Revised Code) with a Surety Company executing the Bond, which is listed on the Treasury Department's most current list (Circular 570 as amended) and authorized to transact business in the State where the project is based. If the bid is accepted, the successful bidder shall enter into a contract and the Proposal Guaranty and Performance/Payment Bond shall provide the conditions in said bond, and as listed below: (A) A Contract Performance Bond in an amount equal to 100% of the estimated cost of the work conditioned, among other things that the Contractor will perform the work upon the terms proposed, within the time prescribed, in accordance with the plans and specifications. (B) A Payment Bond in an amount equal to 100% of the estimated cost of the work conditioned for the payment by the Contractor and all Sub-contractors for labor performed and materials furnished in connection with the project involved. The City of Niles reserves the right to reject any or all bids and waive any informalities in bidding. Bids of Corporations not chartered in Ohio must be accompanied by proper certification that such corporation is authorized to do business in Ohio The successful bidder will be required to pay at least minimum wage rates predetermined by the Secretary of Labor for the project work as required. The Schedule of Approved Wage Rates, as pre-determined by the Secretary of Labor is incorporated in the Contract Documents. This Contract is subject to the provisions of Executive Order 11246 of September 24, 1965, as pertains to an Affirmative Action Plan, and Governor Executive Order of January 27, 1972 A bidder/contractor will be deemed committed to the goals of the City of Niles Plan Bid Conditions by submitting a properly signed bid. All bidders must fill in all blanks of the proposal in ink or typewritten. Entire contract book must be submitted intact with the bid. The successful low bidder will be required to comply with all Contract Requirements for Equal Employment Opportunities. Each bidder must insure that all employees and applicants for employment are not discriminated against because of race, color, religion, sex or national origin. No bids may be withdrawn after the scheduled closing time for the receipt of bids for at least thirty (30) days Engineers Construction Cost Estimate: $ 275,330.00 The work included under this item shall consist of the preparatory planning, work and operations required to set up such things as shops, plants, storage areas, sanitary facilities, moving in personnel, tools, equipment and other facilities or requirements (Insurance, Bonds, Permits) contained in the contract or required by law or regulation. The Contractor shall supply all necessary administration, materials, tools, equipment, and labor to provide all things necessary to begin construction ofthis project. This work shall be carried out in a safe workmanlike manner. The Contractorshall maintain a cellular phone for the resident inspector (see note after page 1 A. 1 ). Approved sanitary facilities shall be available. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |