Similar Projects
SR 134 - Bridge Preservation
Demolition, New Construction, Infrastructure
Design
$530,000 CJ est. value
Martinsville, OH 45146

SR 13 - Roadway Minor Rehabilitation
Infrastructure
Design
$13,644,000 CJ est. value
Norwalk, OH 44857

2022 Street Resurfacing
Infrastructure
Bidding
$750,000 CJ est. value
Bellevue, OH 44811

RFP D/B - Rome Greenwich Road Design/Build Project HUR TR 0076-04.50; FY 2023
Infrastructure
Bidding
$1,100,000 CJ est. value
Greenwich, OH 44837

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Overlay Bridge Deck W/modified Pcc - Elbys Br O/l
Infrastructure
Post-Bid
$600,000 CJ est. value
Triadelphia, WV 26059

Monroeville Route 20 Waterline Replacement
Infrastructure
Results
$550,000 est. value
Monroeville, OH

Purchase and Development of Old School Property
Infrastructure
Results
New London, OH

City of Norwalk 48 Inch Sanitary Sewer
Renovation
Pending Verification
$22,000,000 CJ est. value
Norwalk, OH 44857

Roadway Minor Rehab - US 250
Infrastructure
Design
$2,848,400 CJ est. value
Norwalk, OH 44857

2021 West Main Street Waterline
Infrastructure
Results
$1,048,032 est. value
Norwalk, OH 44857

Bridge Preservation - SR 162
Infrastructure
Design
$878,987 CJ est. value
Willard, OH 44890

Lead Service Line Replacement Project
Infrastructure
Results
$360,000 est. value
New London, OH

Roadway Major Rehab
Infrastructure
Design
$10,730,000 CJ est. value
Willard, OH 44890

Park Avenue and South Main Street Water Main Replacement Project
Infrastructure
Results
$449,000 est. value
New London, OH 44851

Last Updated 10/05/2022 10:10 AM
Project Title

2022 Milan Ave. Waterline and Sewer Project

Physical Address View project details and contacts
City, State (County) Norwalk, OH 44857   (Huron County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $1,135,622 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

2022 Milan Ave Waterline and Sewer- 12" Sanitary Sewer HDPE Sanitary MH Remove & Replace 4" Concrete Walk Remove & Replace 4' Section 42" Cone. Storm Remove & Replace Street Sign Core & Boot Existing Sanitary MH Directional bore under Milan Ave Seeding & Mulching w/ Fert. ODOT 659 Ciass 1 Attention of bidders is called to all of the requirements contained in this bid packet, particularly to the Wage Rates, various insurance requirements, various equal opportunity provisions, and the requirement of the payment bond and performance bond for one hundred percent (100%) of the contract price. Attention of bidders is called to Ohio revised Code Section 153.12 which states that NO contract shall be entered into if the price of the Bids for the project, are in excess of ten percent (10%) above the Engineer s estimate. The City of Norwalk, reserves the right to waive any informalities or to reject any or all bids. The City of Norwalk may, at its discretion, award a contract to the lowest and best bidder. The work will be substantially completed by June 30, 2023 ; General Conditions twenty (20) calendar days thereafter.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents