Similar Projects
Park Trail Improvements
Infrastructure
Bidding
$2,484,000 CJ est. value
Abilene, TX 79601

Park Trail Improvements
Infrastructure
Bidding
$2,484,000 CJ est. value
Abilene, TX 79601

Backup Power and Electrical Upgrade
Infrastructure
Sub-Bidding
$679,700 CJ est. value
Tuscola, TX 79562

BI 20-R - Install Illumination
Infrastructure
Sub-Bidding
$989,712 CJ est. value
Tuscola, TX 79562

Street Resurfacing Project Work Zone N15B and S11A
Infrastructure
Post-Bid
Abilene, TX

Agriculture Complex Meat Lab Parking Lot
Alteration
Post-Bid

Abilene Parking Lot
Results
$165,216 est. value
Abilene, TX 79605

Street Resurfacing Project Work Zone S10 and S17
Results
Abilene, TX

Abilene DHQ Restroom/Roof/Kitchen Upgrades / 08-3804-21434
New Construction, Infrastructure - 15,000 SF
Pending Verification
$1,522,279 CJ est. value
Abilene, TX 79601

North 6th and Cypress Street Improvements
Infrastructure
Bidding
$500,000 est. value
Abilene, TX 79601

IH0020 - Crack Seal
Infrastructure
Sub-Bidding
$922,374 CJ est. value
Merkel, TX 79536

Heritage / Abilene
New Construction, Renovation, Infrastructure - 8,244 SF
Post-Bid
$4,000,000 CJ est. value
Abilene, TX 79601

Street Resurfacing Project Work Zone N3, N5, N8, and N14
Results
Abilene, TX

30 Butterfly Valve Replacement Grimes Booster Pump Station
Infrastructure
Sub-Bidding
$400,000 CJ est. value
Abilene, TX 79601

South Second and Ross Reconstruction Project
Infrastructure
Post-Bid
Abilene, TX 79605

Last Updated 08/02/2022 01:07 PM
Project Title

BI-20 - North 1st Railroad Corridor -Texas Department of Transportation

Physical Address View project details and contacts
City, State (County) Abilene, TX 79601   (Taylor County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $11,039,870 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of pedestrian signals, sidewalk and curb ramps. As of August 2, 2022, a design engineer has been selected. Construction is anticipated to began in July of 2023.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents