Similar Projects
Hess Sanitary Sewer Pump Station Rehabilitation Project
Renovation
Bidding
Hamilton Township, NJ

2021 Sewer Pump Station Maintenance
Term Contract
Bidding
Somers Point, NJ

Garden Street Pump Station Upgrade
Renovation
Sub-Bidding
$1,500,000 est. value
Mount Holly, NJ 08060

Sumner Avenue Pump Station Upgrades
Post-Bid
Union, NJ

Pump Station Maintenance
Term Contract
Post-Bid
Teterboro, NJ 07608

Clean Lift Stations and Catch Basins
Results
Trenton, NJ 08641

Upper Manasquan Pump Station Raw Sewage Pump Rebuilding
Results
Howell, NJ

2021 Proposal Influent Grinders for Wastewater Stations
Term Contract
Bidding
Somers Point, NJ

Various Pump Station Upgrades
Post-Bid
Freehold, NJ 07728

Vincent Place Pumping Station Gear Drive Replacement
Results
Teterboro, NJ 07608

Water Pollution Control Facility Effluent Pump Station Upgrades
Post-Bid
Livingston, NJ

Utility Pump Station Maintenance and Repair
Results
Monmouth Junction, NJ

Oakland Drive West Sanitary Sewer Pump Station Upgrade
Post-Bid
Readington, NJ 08870

Homestead Sewage Pump Station Upgrades
Results
$248,677 est. value
Woodbridge, NJ 07095

Emergency Pump Station Repairs
Post-Bid
Pennsauken, NJ 08109

Last Updated 12/10/2019 03:01 PM
Project Title

Pump Station Upgrades

Physical Address View project details and contacts
City, State (County) Brielle, Manasquan, Wall, NJ   (Monmouth County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Rehabilitation of the Wall North, Glimmer Glass, Wreck Pond, and Brielle Pump Stations within the Township of Wall, the Borough of Brielle, and the Borough of Manasquan, Monmouth County, New Jersey. The work for these four (4) pump stations shall include, but in no way limited to, provision and implementation of bypass pumping system; shutdown and isolation of existing sewage pumps wet wells; demolition of existing concrete diversion walls, floors and flow channels within wet wells; and installation of new FRP grating levels as well as the installation of stainless steel or concrete structural support systems all as noted on the Contract Drawings. Additional work shall include cleaning and repairing of all interior concrete surfaces within each wet well; cleaning and rehabilitation and coating of metal surfaces to remain in each wet well; installation of epoxy coating system on all existing wet well surfaces; installing new stainless steel trash basket with associated mounting and railing requirements; installation of both davit crane hoists and fall protection/retrieval hoists; and installation of flood protection measures, as shown on the drawings and specified herein. In addition to the work described above, work uniquely designated at the Brielle Pump Station shall include installation of new aluminum flow channel within wet well; cutting of existing wet well top slab with installation of new fall safe hatch access; construction of architectural and facade improvements to the existing building; and installation of a 6-foot vinyl fence around the pump station site. The work shall be completed within 365-days of notice to proceed. However, it shall be specifically understood that the actual construction time frame where Contractors will be permitted to bypass sewage at the Contract pump stations will be limited to between September 3, 2019 and May 21, 2020. Contractors shall further note that they will be permitted to bypass flow at no more than 2-pump stations at any given time between September 3, 2019 and May 21, 2020.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents